Caledonian Road and Barnsbury
CIRLondonManaged by London Overground
How this station is performing
Caledonian Road and Barnsbury had 105,834 scheduled stops to Period 7 of 2026-27, about 291 a day. 79.3% of recorded arrivals were within three minutes of the timetable and 9.0% of scheduled stops were cancelled.
Caledonian Road and Barnsbury opened on 21 November 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Highbury and Islington is the oldest (1850) and Essex Road the newest (1904), with Caledonian Road and Barnsbury in between.
The nearest stations to Caledonian Road and Barnsbury are Highbury and Islington (0.9 km north-east), Drayton Park (1.3 km north-east), London Kings Cross (1.3 km south-west), Essex Road (1.3 km east) and London St Pancras International (1.4 km south-west). 123 stations lie within 10 km in all. Of the five, Essex Road is the most punctual at 91.8% and London Kings Cross the least at 76.9%, with Caledonian Road and Barnsbury on 79.3%.
Caledonian Road and Barnsbury is named after Barnsbury, an area of London, but the station stands 0.2 km from its centre.
2 of 3 stations of a similar size in London are more punctual than Caledonian Road and Barnsbury on 79.3%. The comparison group includes Hackney Central (81.2%), Hackney Wick (78.5%) and Dalston Kingsland (81.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 105,834 | 79.3% | 9.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,336 | 82.3% | 6.4% |
| Period 6 of 2026-27 | 8,279 | 76.6% | 11.1% |
| Period 5 of 2026-27 | 8,256 | 80.8% | 17.6% |
| Period 4 of 2026-27 | 8,256 | 74.7% | 14.6% |
| Period 3 of 2026-27 | 7,150 | 76.9% | 9.0% |
| Period 2 of 2026-27 | 8,237 | 78.2% | 12.1% |
| Period 1 of 2026-27 | 9,472 | 83.5% | 5.1% |
| Period 13 of 2025-26 | 8,948 | 83.6% | 4.2% |
| Period 12 of 2025-26 | 7,916 | 81.5% | 6.1% |
| Period 11 of 2025-26 | 7,823 | 79.3% | 7.6% |
| Period 10 of 2025-26 | 7,009 | 80.7% | 7.5% |
| Period 9 of 2025-26 | 8,030 | 72.8% | 11.5% |
| Period 8 of 2025-26 | 8,122 | 78.1% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hackney Central | 105,833 | 81.2% | 10.5% |
| Hackney Wick | 105,833 | 78.5% | 10.5% |
| Dalston Kingsland | 105,836 | 81.8% | 10.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out