Crystal Palace
CYPLondonManaged by London Overground
How this station is performing
Crystal Palace had 119,274 scheduled stops to Period 7 of 2026-27, about 328 a day. 93.8% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Crystal Palace opened on 10 June 1854, 172 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Anerley is the oldest (1839) and Penge East the newest (1863), with Crystal Palace in between.
The nearest stations to Crystal Palace are Anerley (0.7 km south-east), Penge West (0.7 km east), Gipsy Hill (1.2 km north-west), Penge East (1.2 km east) and Sydenham (London) (1.6 km north-east). 109 stations lie within 10 km in all. Of the five, Gipsy Hill is the most punctual at 95.4% and Penge East the least at 84.5%, with Crystal Palace on 93.8%.
Crystal Palace takes its name from an area of London called Crystal Palace, home to about 12,255 people, and the station stands 0.3 km from its centre.
2 operators call at Crystal Palace: GTR (93.6%, 55% of stops) and London Overground (94.0%, 45% of stops). They are close together, with London Overground leading on 94.0% and GTR trailing on 93.6%, a gap of 0.4 percentage points.
Compared with 3 stations of a similar size in London, Crystal Palace is the most punctual, at 93.8%. The comparison group includes Seven Kings (88.4%), Gidea Park (87.9%) and Ilford (90.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 65,854 | 93.6% | 2.8% |
| London Overground | 53,420 | 94.0% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Crystal Palace? Delay Repay
These operators call at Crystal Palace and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,162 | 92.1% | 4.1% |
| Period 6 of 2026-27 | 9,115 | 89.0% | 3.0% |
| Period 5 of 2026-27 | 8,878 | 89.3% | 6.6% |
| Period 4 of 2026-27 | 9,261 | 93.0% | 4.7% |
| Period 3 of 2026-27 | 9,059 | 94.1% | 3.0% |
| Period 2 of 2026-27 | 8,985 | 95.6% | 2.8% |
| Period 1 of 2026-27 | 10,641 | 95.2% | 3.3% |
| Period 13 of 2025-26 | 9,779 | 95.4% | 2.8% |
| Period 12 of 2025-26 | 8,987 | 95.3% | 3.7% |
| Period 11 of 2025-26 | 8,927 | 93.4% | 3.8% |
| Period 10 of 2025-26 | 8,485 | 95.2% | 2.1% |
| Period 9 of 2025-26 | 9,237 | 95.5% | 2.3% |
| Period 8 of 2025-26 | 8,758 | 95.6% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Seven Kings | 119,191 | 88.4% | 2.5% |
| Gidea Park | 118,902 | 87.9% | 2.7% |
| Ilford | 118,890 | 90.1% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out