GTR at London Blackfriars
How this operator is doing here
GTR had 199,652 scheduled stops at London Blackfriars in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 80.4% of recorded arrivals came within three minutes and 5.4% of stops were cancelled.
GTR trains at London Blackfriars also serve City Thameslink (0.5 km north, 77.2% on time, 5.8% cancelled), Farringdon (1.0 km north, 79.6% on time, 5.9% cancelled), Moorgate (1.3 km north-east, 89.1% on time, 4.9% cancelled), London Bridge (1.4 km south-east, 83.8% on time, 3.9% cancelled), Elephant and Castle (1.9 km south, 85.6% on time, 5.8% cancelled) and Old Street (2.0 km north-east, 90.2% on time, 4.9% cancelled), which are the stations on its network closest to London Blackfriars.
Within 30 km of here, GTR runs best at Beckenham Junction, 12.3 km south-east (98.1%), and worst at Kenley, 20.7 km south (66.9%).
The busiest GTR station within 30 km of London Blackfriars is East Croydon, 15.0 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at London Blackfriars, GTR is the least punctual, at 80.4%.
Over three full railway years GTR at London Blackfriars has improved each time, from 75.1% within three minutes in 2023-24 to 79.1% in 2024-25 and 81.5% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 16,145 | 75.3% | 3.2% |
| Period 6 of 2026-27 | 15,592 | 75.2% | 6.7% |
| Period 5 of 2026-27 | 15,189 | 75.6% | 7.2% |
| Period 4 of 2026-27 | 15,763 | 78.0% | 6.2% |
| Period 3 of 2026-27 | 12,753 | 79.4% | 5.1% |
| Period 2 of 2026-27 | 13,838 | 84.7% | 4.5% |
| Period 1 of 2026-27 | 17,270 | 86.7% | 4.0% |
| Period 13 of 2025-26 | 17,307 | 85.6% | 2.8% |
| Period 12 of 2025-26 | 15,888 | 83.8% | 5.4% |
| Period 11 of 2025-26 | 15,291 | 81.8% | 4.8% |
| Period 10 of 2025-26 | 12,830 | 82.0% | 6.8% |
| Period 9 of 2025-26 | 16,006 | 76.3% | 9.4% |
| Period 8 of 2025-26 | 15,780 | 79.2% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Blackfriars
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 5,173 | 86.9% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out