Llanishen
LLSWalesManaged by TfW Rail
How this station is performing
Llanishen had 52,939 scheduled stops to Period 7 of 2026-27, about 145 a day. 92.4% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Llanishen opened on 1 April 1871, 155 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Llanishen is the oldest; the next oldest, Heath Low Level, dates from 1911.
The nearest stations to Llanishen are Lisvane and Thornhill (1.3 km north), Ty Glas (1.6 km south-west), Heath High Level (1.8 km south), Birchgrove (1.9 km south-west) and Heath Low Level (1.9 km south). 26 stations lie within 10 km in all. At 92.4%, Llanishen is less punctual than all of them; the best of the five, Birchgrove, manages 96.2%.
Llanishen is one of 2 stations named after a suburb called Llanishen, home to about 10,326 people; this one stands 0.7 km from its centre.
Llanishen improved sharply over the past year. In the latest 13 periods 92.4% of stops came within three minutes of the timetable, up 6.0 percentage points from 86.4% in the 13 before. Cancellations fell to 4.1% of scheduled stops from 4.8%, which is 0.7 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Llanishen is the least punctual, at 92.4%. All of them are ahead, including Lisvane and Thornhill (92.7%), Heath High Level (93.4%) and Caerphilly (93.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 52,939 | 92.4% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Llanishen? Delay Repay
These operators call at Llanishen and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,251 | 91.8% | 4.0% |
| Period 6 of 2026-27 | 4,350 | 92.4% | 2.9% |
| Period 5 of 2026-27 | 4,137 | 91.8% | 5.0% |
| Period 4 of 2026-27 | 4,234 | 91.5% | 5.0% |
| Period 3 of 2026-27 | 4,370 | 93.4% | 4.0% |
| Period 2 of 2026-27 | 4,149 | 94.2% | 6.4% |
| Period 1 of 2026-27 | 5,081 | 95.0% | 4.7% |
| Period 13 of 2025-26 | 4,780 | 95.4% | 4.0% |
| Period 12 of 2025-26 | 3,309 | 95.6% | 2.0% |
| Period 11 of 2025-26 | 4,334 | 94.4% | 3.0% |
| Period 10 of 2025-26 | 3,550 | 90.1% | 4.3% |
| Period 9 of 2025-26 | 3,141 | 83.8% | 5.6% |
| Period 8 of 2025-26 | 3,253 | 87.6% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lisvane and Thornhill | 52,939 | 92.7% | 4.1% |
| Heath High Level | 52,982 | 93.4% | 4.1% |
| Caerphilly | 55,463 | 93.5% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out