How this station is performing
Caerphilly had 55,463 scheduled stops to Period 7 of 2026-27, about 152 a day. 93.5% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
The nearest stations to Caerphilly are Aber (0.8 km north-west), Energlyn and Churchill Park (1.6 km north-west), Llanbradach (3.8 km north), Lisvane and Thornhill (3.8 km south-east) and Taffs Well (4.6 km south-west). 26 stations lie within 10 km in all. At 93.5%, Caerphilly is more punctual than every one of them; the best of the five, Aber, manages 93.0%.
Caerphilly takes its name from a town called Caerphilly, home to about 15,989 people, and the station stands 0.7 km from its centre.
Caerphilly has edged up: 93.5% of stops came within three minutes of the timetable in the latest 13 periods, 4.3 percentage points better than the 89.2% of the 13 before. Cancellations fell to 3.0% of scheduled stops from 3.6%, which is 0.6 percentage points fewer.
Across the whole run of data, the weakest four-week period for Caerphilly was Period 9 of 2023-24, at 75.8%, some time before the latest year. The strongest was Period 12 of 2025-26, at 96.4%, and the two are 20.6 percentage points apart. Cancellations peaked at 8.5% of scheduled stops in Period 1 of 2023-24, against 3.0% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Caerphilly is the most punctual, at 93.5%. The comparison group includes Bridgend (70.4%), Heath High Level (93.4%) and Lisvane and Thornhill (92.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 55,463 | 93.5% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Caerphilly? Delay Repay
These operators call at Caerphilly and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,252 | 93.3% | 2.7% |
| Period 6 of 2026-27 | 4,350 | 93.7% | 1.6% |
| Period 5 of 2026-27 | 4,137 | 92.7% | 3.7% |
| Period 4 of 2026-27 | 4,234 | 93.0% | 3.2% |
| Period 3 of 2026-27 | 4,370 | 94.8% | 2.9% |
| Period 2 of 2026-27 | 4,164 | 94.0% | 4.9% |
| Period 1 of 2026-27 | 5,081 | 95.2% | 3.4% |
| Period 13 of 2025-26 | 4,808 | 96.0% | 3.0% |
| Period 12 of 2025-26 | 3,309 | 96.4% | 1.2% |
| Period 11 of 2025-26 | 4,334 | 95.6% | 2.1% |
| Period 10 of 2025-26 | 3,831 | 92.0% | 3.7% |
| Period 9 of 2025-26 | 4,216 | 87.4% | 4.1% |
| Period 8 of 2025-26 | 4,377 | 90.6% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bridgend | 56,899 | 70.4% | 2.2% |
| Heath High Level | 52,982 | 93.4% | 4.1% |
| Lisvane and Thornhill | 52,939 | 92.7% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out