Heath High Level
HHLWalesManaged by TfW Rail
How this station is performing
Heath High Level had 52,982 scheduled stops to Period 7 of 2026-27, about 146 a day. 93.4% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Heath High Level opened on 1 October 1915, 111 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Llanishen is the oldest (1871) and Ty Glas the newest (1987), with Heath High Level in between.
The nearest stations to Heath High Level are Heath Low Level (0.1 km south), Ty Glas (1.2 km north-west), Birchgrove (1.5 km west), Llanishen (1.8 km north) and Rhiwbina (2.3 km west). 29 stations lie within 10 km in all. Of the five, Birchgrove is the most punctual at 96.2% and Llanishen the least at 92.4%, with Heath High Level on 93.4%.
Heath High Level is named after Heath, a suburb, home to about 12,629 people, but the station stands 1.4 km from its centre.
1 of 3 stations of a similar size in Wales are more punctual than Heath High Level on 93.4%. The comparison group includes Lisvane and Thornhill (92.7%), Llanishen (92.4%) and Caerphilly (93.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 52,982 | 93.4% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Heath High Level? Delay Repay
These operators call at Heath High Level and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,251 | 92.4% | 4.0% |
| Period 6 of 2026-27 | 4,350 | 93.6% | 2.8% |
| Period 5 of 2026-27 | 4,137 | 93.2% | 4.8% |
| Period 4 of 2026-27 | 4,234 | 92.5% | 4.9% |
| Period 3 of 2026-27 | 4,370 | 94.6% | 3.8% |
| Period 2 of 2026-27 | 4,164 | 94.4% | 6.3% |
| Period 1 of 2026-27 | 5,081 | 95.7% | 4.6% |
| Period 13 of 2025-26 | 4,808 | 95.8% | 4.0% |
| Period 12 of 2025-26 | 3,309 | 95.5% | 2.0% |
| Period 11 of 2025-26 | 4,334 | 95.4% | 3.0% |
| Period 10 of 2025-26 | 3,550 | 91.8% | 4.3% |
| Period 9 of 2025-26 | 3,141 | 85.9% | 5.6% |
| Period 8 of 2025-26 | 3,253 | 88.6% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lisvane and Thornhill | 52,939 | 92.7% | 4.1% |
| Llanishen | 52,939 | 92.4% | 4.1% |
| Caerphilly | 55,463 | 93.5% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out