CrossCountry at Liskeard
How this operator is doing here
CrossCountry had 1,445 scheduled stops at Liskeard in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 55.3% of recorded arrivals came within three minutes and 11.6% of stops were cancelled.
CrossCountry trains at Liskeard also serve Bodmin Parkway (13.7 km west, 58.9% on time, 11.7% cancelled), Lostwithiel (14.6 km west, 57.1% on time, 11.5% cancelled), Par (19.5 km south-west, 56.6% on time, 10.7% cancelled), Plymouth (24.4 km east, 69.8% on time, 7.5% cancelled), St Austell (25.6 km south-west, 59.5% on time, 12.2% cancelled) and Truro (46.8 km south-west, 56.4% on time, 12.9% cancelled), which are the stations on its network closest to Liskeard.
The busiest CrossCountry station within 30 km of Liskeard is Plymouth, 24.4 km east, with about 29 scheduled stops a day.
Of the 2 operators with enough records at Liskeard, CrossCountry is the least punctual, at 55.3%.
For CrossCountry, Liskeard is the 91st best of 99 ranked stations. Its 55.3% here is 7.9 percentage points below the 63.2% across the whole network.
CrossCountry at Liskeard has slipped sharply. 55.3% of stops came within three minutes of the timetable in the latest 13 periods, 9.5 percentage points worse than the 64.8% recorded in the 13 before. Cancellations held steady at 11.6% of scheduled stops, against 11.9% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 65.0% | 14.2% |
| Period 6 of 2026-27 | 120 | 47.6% | 14.2% |
| Period 5 of 2026-27 | 117 | 39.4% | 11.1% |
| Period 4 of 2026-27 | 120 | 36.9% | 14.2% |
| Period 3 of 2026-27 | 108 | 50.0% | 5.6% |
| Period 2 of 2026-27 | 112 | 45.5% | 9.8% |
| Period 1 of 2026-27 | 120 | 60.2% | 5.8% |
| Period 13 of 2025-26 | 114 | 73.8% | 6.1% |
| Period 12 of 2025-26 | 104 | 68.0% | 3.8% |
| Period 11 of 2025-26 | 104 | 60.8% | 24.0% |
| Period 10 of 2025-26 | 96 | 60.5% | 20.8% |
| Period 9 of 2025-26 | 94 | 52.5% | 14.9% |
| Period 8 of 2025-26 | 116 | 59.4% | 8.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Liskeard
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 28,570 | 74.7% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out