Liskeard
LSKSouth WestManaged by Great Western Railway
How this station is performing
Liskeard had 30,015 scheduled stops to Period 7 of 2026-27, about 82 a day. 73.8% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Liskeard opened on 4 May 1859, 167 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Liskeard is the oldest; the next oldest, Menheniot, dates from 1859.
The nearest stations to Liskeard are Coombe Junction Halt (0.9 km west), St Keyne Wishing Well Halt (2.7 km south), Causeland (4.6 km south), Menheniot (4.8 km south-east) and Sandplace (6.6 km south). 6 stations lie within 10 km in all. At 73.8%, Liskeard is less punctual than all of them; the best of the five, Coombe Junction Halt, manages 90.9%.
Liskeard takes its name from a market town called Liskeard, home to about 10,902 people, and the station stands 0.8 km from its centre.
2 operators call at Liskeard: Great Western Railway (74.7%, 95% of stops) and CrossCountry (55.3%, 5% of stops). The operator you travel with matters: Great Western Railway reaches 74.7% within three minutes while CrossCountry manages 55.3%, a gap of 19.4 percentage points.
Compared with 3 stations of a similar size in South West, Liskeard is the most punctual, at 73.8%. The comparison group includes Nailsea and Backwell (73.1%), Yatton (71.9%) and Worle (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 28,570 | 74.7% | 5.0% |
| CrossCountry | 1,445 | 55.3% | 11.6% |
Operators with their own page for this station are linked to it.
Late train at Liskeard? Delay Repay
These operators call at Liskeard and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,355 | 82.3% | 3.0% |
| Period 6 of 2026-27 | 2,496 | 75.3% | 7.3% |
| Period 5 of 2026-27 | 2,579 | 67.0% | 9.5% |
| Period 4 of 2026-27 | 2,581 | 67.9% | 7.9% |
| Period 3 of 2026-27 | 2,567 | 72.2% | 6.9% |
| Period 2 of 2026-27 | 2,510 | 74.6% | 4.2% |
| Period 1 of 2026-27 | 2,808 | 81.8% | 2.2% |
| Period 13 of 2025-26 | 2,466 | 83.9% | 2.1% |
| Period 12 of 2025-26 | 1,742 | 76.4% | 2.2% |
| Period 11 of 2025-26 | 1,760 | 73.4% | 9.8% |
| Period 10 of 2025-26 | 1,559 | 62.4% | 6.2% |
| Period 9 of 2025-26 | 2,148 | 64.4% | 5.6% |
| Period 8 of 2025-26 | 2,444 | 71.8% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Nailsea and Backwell | 29,687 | 73.1% | 3.2% |
| Yatton | 30,423 | 71.9% | 3.2% |
| Worle | 29,537 | 71.8% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out