Nailsea and Backwell
NLSSouth WestManaged by Great Western Railway
How this station is performing
Nailsea and Backwell had 29,687 scheduled stops to Period 7 of 2026-27, about 82 a day. 73.1% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Nailsea and Backwell opened on 14 June 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Nailsea and Backwell is the oldest; the next oldest, Yatton, dates from 1841.
The nearest stations to Nailsea and Backwell are Yatton (6.3 km south-west), Shirehampton (8.7 km north-east), Portway Park and Ride (8.7 km north-east), Avonmouth (9.6 km north) and Sea Mills (9.6 km north-east). 6 stations lie within 10 km in all. Of the five, Avonmouth is the most punctual at 74.6% and Portway Park and Ride the least at 68.7%, with Nailsea and Backwell on 73.1%.
Nailsea and Backwell is named after Nailsea, a town, home to about 15,539 people, but the station stands 1.4 km from its centre.
1 of 3 stations of a similar size in South West are more punctual than Nailsea and Backwell on 73.1%. The comparison group includes Worle (71.8%), Liskeard (73.8%) and Par (69.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 29,687 | 73.1% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Nailsea and Backwell? Delay Repay
These operators call at Nailsea and Backwell and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,227 | 75.7% | 2.9% |
| Period 6 of 2026-27 | 2,278 | 69.8% | 2.9% |
| Period 5 of 2026-27 | 2,303 | 61.9% | 5.5% |
| Period 4 of 2026-27 | 2,304 | 67.4% | 4.7% |
| Period 3 of 2026-27 | 2,225 | 71.6% | 4.4% |
| Period 2 of 2026-27 | 2,267 | 72.7% | 3.1% |
| Period 1 of 2026-27 | 2,572 | 79.0% | 1.5% |
| Period 13 of 2025-26 | 2,505 | 79.0% | 1.6% |
| Period 12 of 2025-26 | 2,288 | 85.9% | 1.1% |
| Period 11 of 2025-26 | 2,220 | 83.1% | 1.9% |
| Period 10 of 2025-26 | 2,051 | 71.0% | 4.7% |
| Period 9 of 2025-26 | 2,317 | 62.9% | 4.1% |
| Period 8 of 2025-26 | 2,130 | 67.5% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out