ScotRail at Leuchars (For St. Andrews)
All trains at Leuchars (For St. Andrews)ScotRail across BritainScotland
How this operator is doing here
ScotRail had 20,140 scheduled stops at Leuchars (For St. Andrews) in the 13 periods to Period 7 of 2026-27, 86% of the station's total. 76.5% of recorded arrivals came within three minutes and 1.0% of stops were cancelled.
ScotRail trains at Leuchars (For St. Andrews) also serve Cupar (9.6 km south-west, 76.8% on time, 1.1% cancelled), Dundee (10.3 km north-west, 81.4% on time, 1.3% cancelled), Broughty Ferry (10.4 km north, 76.6% on time, 2.1% cancelled), Balmossie (11.6 km north, – on time, 3.7% cancelled), Monifieth (12.6 km north, – on time, 2.2% cancelled) and Springfield (13.2 km south-west, 83.3% on time, 0.9% cancelled), which are the stations on its network closest to Leuchars (For St. Andrews).
Within 30 km of here, ScotRail runs best at Leven, 21.4 km south (83.4%), and worst at Carnoustie, 18.2 km north-east (68.9%).
The busiest ScotRail station within 30 km of Leuchars (For St. Andrews) is Dundee, 10.3 km north-west, with about 124 scheduled stops a day.
Of the 3 operators with enough records at Leuchars (For St. Andrews), ScotRail is the most punctual, at 76.5%.
Over three full railway years ScotRail at Leuchars (For St. Andrews) has improved each time, from 65.6% within three minutes in 2023-24 to 73.4% in 2024-25 and 77.3% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,546 | 70.0% | 1.2% |
| Period 6 of 2026-27 | 1,559 | 81.2% | 0.9% |
| Period 5 of 2026-27 | 1,562 | 72.2% | 1.7% |
| Period 4 of 2026-27 | 1,558 | 76.8% | 1.0% |
| Period 3 of 2026-27 | 1,557 | 79.8% | 1.2% |
| Period 2 of 2026-27 | 1,554 | 79.3% | 0.6% |
| Period 1 of 2026-27 | 1,794 | 81.1% | 0.6% |
| Period 13 of 2025-26 | 1,698 | 80.6% | 0.5% |
| Period 12 of 2025-26 | 1,552 | 72.1% | 0.6% |
| Period 11 of 2025-26 | 1,440 | 78.4% | 1.7% |
| Period 10 of 2025-26 | 1,337 | 74.6% | 0.9% |
| Period 9 of 2025-26 | 1,492 | 72.9% | 2.0% |
| Period 8 of 2025-26 | 1,491 | 74.8% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Leuchars (For St. Andrews)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 2,626 | 61.0% | 1.6% |
| CrossCountry | 692 | 54.3% | 13.6% |
| Caledonian Sleeper | 45 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out