How this operator is doing here
LNER had 23,151 scheduled stops at Leeds in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 70.1% of recorded arrivals came within three minutes and 3.8% of stops were cancelled.
LNER trains at Leeds also serve Horsforth (8.0 km north-west, 73.1% on time, 6.2% cancelled), Wakefield Westgate (12.8 km south, 64.7% on time, 3.7% cancelled), Bradford Forster Square (13.4 km west, 88.3% on time, 5.8% cancelled), Shipley (Yorks) (15.4 km west, 81.7% on time, 5.7% cancelled), Harrogate (22.1 km north, 87.5% on time, 6.1% cancelled) and Keighley (24.5 km west, 68.2% on time, 8.8% cancelled), which are the stations on its network closest to Leeds.
Within 30 km of here, LNER runs best at Bradford Forster Square, 13.4 km west (88.3%), and worst at Wakefield Westgate, 12.8 km south (64.7%).
The busiest LNER station within 30 km of Leeds is Wakefield Westgate, 12.8 km south, with about 62 scheduled stops a day.
LNER at Leeds has slipped a little, from 73.8% within three minutes in the previous 13 periods to 70.1% in the latest 13, a fall of 3.7 percentage points. Cancellations rose to 3.8% of scheduled stops from 2.9%, which is 0.9 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,830 | 70.4% | 1.8% |
| Period 6 of 2026-27 | 1,801 | 67.2% | 4.4% |
| Period 5 of 2026-27 | 1,816 | 66.3% | 6.3% |
| Period 4 of 2026-27 | 1,832 | 67.8% | 3.8% |
| Period 3 of 2026-27 | 1,698 | 64.2% | 2.5% |
| Period 2 of 2026-27 | 1,819 | 68.0% | 4.9% |
| Period 1 of 2026-27 | 2,101 | 72.5% | 6.1% |
| Period 13 of 2025-26 | 1,927 | 77.1% | 2.7% |
| Period 12 of 2025-26 | 1,596 | 74.1% | 3.5% |
| Period 11 of 2025-26 | 1,649 | 74.5% | 3.1% |
| Period 10 of 2025-26 | 1,595 | 71.9% | 2.6% |
| Period 9 of 2025-26 | 1,709 | 65.1% | 5.3% |
| Period 8 of 2025-26 | 1,778 | 71.6% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Leeds
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 283,847 | 79.5% | 2.2% |
| TransPennine Express | 51,491 | 68.0% | 2.0% |
| CrossCountry | 10,895 | 61.3% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out