ScotRail at Laurencekirk
How this operator is doing here
ScotRail had 13,427 scheduled stops at Laurencekirk in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 82.4% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
ScotRail trains at Laurencekirk also serve Montrose (13.8 km south, 76.1% on time, 1.8% cancelled), Stonehaven (20.5 km north-east, 81.2% on time, 1.9% cancelled), Arbroath (31.8 km south, 71.8% on time, 1.7% cancelled), Portlethen (32.2 km north-east, – on time, 2.2% cancelled), Carnoustie (40.2 km south, 68.9% on time, 1.9% cancelled) and Aberdeen (40.6 km north-east, 86.6% on time, 1.6% cancelled), which are the stations on its network closest to Laurencekirk.
The busiest ScotRail station within 30 km of Laurencekirk is Montrose, 13.8 km south, with about 71 scheduled stops a day.
Of the 1 operators with enough records at Laurencekirk, ScotRail is the most punctual, at 82.4%.
For ScotRail, Laurencekirk is the 250th best of 312 ranked stations. Its 82.4% here is 5.5 percentage points below the 87.9% across the whole network.
Cancellations of ScotRail at Laurencekirk are near its usual level: 2.2% of scheduled stops, against 1.6% across its network and 2.2% for every operator at the station.
Over three full railway years ScotRail at Laurencekirk has got worse each time, from 84.1% within three minutes in 2023-24 to 83.2% in 2024-25 and 82.9% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,064 | 82.7% | 1.4% |
| Period 6 of 2026-27 | 1,064 | 88.2% | 1.5% |
| Period 5 of 2026-27 | 1,061 | 83.8% | 3.5% |
| Period 4 of 2026-27 | 1,064 | 86.4% | 1.6% |
| Period 3 of 2026-27 | 1,066 | 84.8% | 1.9% |
| Period 2 of 2026-27 | 1,046 | 88.3% | 1.4% |
| Period 1 of 2026-27 | 1,191 | 86.3% | 1.5% |
| Period 13 of 2025-26 | 1,121 | 83.0% | 2.8% |
| Period 12 of 2025-26 | 892 | 78.3% | 2.1% |
| Period 11 of 2025-26 | 914 | 72.7% | 3.0% |
| Period 10 of 2025-26 | 888 | 74.5% | 4.2% |
| Period 9 of 2025-26 | 1,028 | 78.7% | 1.6% |
| Period 8 of 2025-26 | 1,028 | 78.8% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Laurencekirk
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 1 | – | – |
| CrossCountry | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out