ScotRail at Larbert
How this operator is doing here
ScotRail had 49,927 scheduled stops at Larbert in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 92.7% of recorded arrivals came within three minutes and 0.8% of stops were cancelled.
ScotRail trains at Larbert also serve Camelon (1.9 km south, 93.8% on time, 0.9% cancelled), Falkirk Grahamston (3.5 km south-east, 91.2% on time, 0.9% cancelled), Falkirk High (4.1 km south-east, 93.4% on time, 1.2% cancelled), Polmont (8.3 km south-east, 92.7% on time, 1.0% cancelled), Alloa (11.0 km north, 95.6% on time, 1.4% cancelled) and Stirling (12.6 km north-west, 90.0% on time, 1.2% cancelled), which are the stations on its network closest to Larbert.
Within 30 km of here, ScotRail runs best at Alloa, 11.0 km north (95.6%), and worst at Bargeddie, 24.3 km south-west (69.7%).
The busiest ScotRail station within 30 km of Larbert is Stirling, 12.6 km north-west, with about 214 scheduled stops a day.
Of the 2 operators with enough records at Larbert, ScotRail is the most punctual, at 92.7%.
For ScotRail, Larbert is the 66th best of 312 ranked stations. Its 92.7% here is 4.8 percentage points above the 87.9% across the whole network.
ScotRail cancels fewer trains at Larbert than elsewhere: 0.8% of scheduled stops, against 1.6% across its network and 0.9% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,848 | 92.9% | 0.4% |
| Period 6 of 2026-27 | 3,770 | 93.3% | 1.3% |
| Period 5 of 2026-27 | 3,849 | 92.4% | 0.3% |
| Period 4 of 2026-27 | 3,783 | 92.1% | 1.9% |
| Period 3 of 2026-27 | 3,849 | 93.5% | 1.0% |
| Period 2 of 2026-27 | 3,846 | 95.1% | 0.9% |
| Period 1 of 2026-27 | 4,437 | 92.7% | 0.6% |
| Period 13 of 2025-26 | 4,205 | 93.7% | 1.0% |
| Period 12 of 2025-26 | 3,837 | 94.8% | 0.4% |
| Period 11 of 2025-26 | 3,852 | 90.6% | 0.5% |
| Period 10 of 2025-26 | 3,291 | 92.3% | 0.1% |
| Period 9 of 2025-26 | 3,680 | 91.3% | 1.0% |
| Period 8 of 2025-26 | 3,680 | 89.8% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Larbert
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lumo (West Coast) | 795 | 72.1% | 6.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out