Northern at Langley Mill
All trains at Langley MillNorthern across BritainEast Midlands
How this operator is doing here
Northern had 12,472 scheduled stops at Langley Mill in the 13 periods to Period 7 of 2026-27, 82% of the station's total. 75.3% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Northern trains at Langley Mill also serve Ilkeston (4.9 km south-east, 73.2% on time, 2.2% cancelled), Alfreton (9.6 km north, 78.1% on time, 2.1% cancelled), Nottingham (14.7 km south-east, 76.6% on time, 2.1% cancelled), Chesterfield (25.2 km north, 79.1% on time, 1.9% cancelled), Dronfield (32.8 km north, 77.1% on time, 1.7% cancelled) and Worksop (35.4 km north-east, 81.4% on time, 2.0% cancelled), which are the stations on its network closest to Langley Mill.
Within 30 km of here, Northern runs best at Chesterfield, 25.2 km north (79.1%), and worst at Ilkeston, 4.9 km south-east (73.2%).
The busiest Northern station within 30 km of Langley Mill is Chesterfield, 25.2 km north, with about 35 scheduled stops a day.
Of the 2 operators with enough records at Langley Mill, Northern is the most punctual, at 75.3%.
For Northern, Langley Mill is the 361st best of 493 ranked stations. Its 75.3% here is 3.3 percentage points below the 78.6% across the whole network.
Northern at Langley Mill has slipped a little, from 77.6% within three minutes in the previous 13 periods to 75.3% in the latest 13, a fall of 2.3 percentage points. Cancellations fell to 2.2% of scheduled stops from 3.6%, which is 1.4 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 968 | 79.5% | 1.4% |
| Period 6 of 2026-27 | 935 | 75.4% | 1.4% |
| Period 5 of 2026-27 | 810 | 75.3% | 1.4% |
| Period 4 of 2026-27 | 966 | 74.6% | 4.0% |
| Period 3 of 2026-27 | 969 | 72.6% | 2.9% |
| Period 2 of 2026-27 | 972 | 74.0% | 2.6% |
| Period 1 of 2026-27 | 1,108 | 77.8% | 1.2% |
| Period 13 of 2025-26 | 1,000 | 75.5% | 2.5% |
| Period 12 of 2025-26 | 964 | 78.5% | 1.2% |
| Period 11 of 2025-26 | 962 | 80.1% | 1.7% |
| Period 10 of 2025-26 | 882 | 74.2% | 1.6% |
| Period 9 of 2025-26 | 964 | 64.5% | 3.8% |
| Period 8 of 2025-26 | 972 | 75.8% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Langley Mill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 2,649 | 56.8% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out