Langley Mill
LGMEast MidlandsManaged by East Midlands Railway
How this station is performing
Langley Mill had 15,121 scheduled stops to Period 7 of 2026-27, about 42 a day. 72.1% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Langley Mill opened on 6 September 1847 and closed to passengers on 4 May 1926. It reopened on 12 May 1986, 40 years before the latest figures. The First World War closed Langley Mill on 1 January 1917, and it reopened on 3 May 1920. Of the 5 stations nearest to it with a known opening date, Langley Mill is the oldest; the next oldest, Ilkeston, dates from 1847.
The nearest stations to Langley Mill are Ilkeston (4.9 km south-east), Newstead (9.3 km north-east), Hucknall (9.3 km east), Bulwell (9.3 km east) and Alfreton (9.6 km north). 5 stations lie within 10 km in all. Of the five, Newstead is the most punctual at 88.2% and Alfreton the least at 71.1%, with Langley Mill on 72.1%.
Langley Mill takes its name from a town called Langley Mill, home to about 5,805 people, and the station stands 0.5 km from its centre.
2 operators call at Langley Mill: Northern (75.3%, 82% of stops) and East Midlands Railway (56.8%, 18% of stops). The operator you travel with matters: Northern reaches 75.3% within three minutes while East Midlands Railway manages 56.8%, a gap of 18.5 percentage points.
Compared with 3 stations of a similar size in East Midlands, Langley Mill is the least punctual, at 72.1%. All of them are ahead, including Lowdham (83.9%), Kirkby-in-Ashfield (84.6%) and Mansfield (84.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,472 | 75.3% | 2.2% |
| East Midlands Railway | 2,649 | 56.8% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Langley Mill? Delay Repay
These operators call at Langley Mill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,172 | 75.6% | 1.7% |
| Period 6 of 2026-27 | 1,123 | 70.9% | 1.9% |
| Period 5 of 2026-27 | 961 | 72.3% | 2.0% |
| Period 4 of 2026-27 | 1,162 | 71.1% | 4.1% |
| Period 3 of 2026-27 | 1,173 | 69.1% | 3.7% |
| Period 2 of 2026-27 | 1,176 | 69.9% | 2.9% |
| Period 1 of 2026-27 | 1,335 | 76.4% | 1.3% |
| Period 13 of 2025-26 | 1,268 | 71.6% | 2.7% |
| Period 12 of 2025-26 | 1,178 | 75.7% | 1.8% |
| Period 11 of 2025-26 | 1,165 | 78.0% | 2.4% |
| Period 10 of 2025-26 | 1,072 | 71.9% | 2.1% |
| Period 9 of 2025-26 | 1,164 | 62.0% | 4.0% |
| Period 8 of 2025-26 | 1,172 | 72.0% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lowdham | 15,052 | 83.9% | 2.4% |
| Kirkby-in-Ashfield | 14,887 | 84.6% | 3.0% |
| Mansfield | 14,887 | 84.4% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out