East Midlands Railway at Langley Mill
All trains at Langley MillEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 2,649 scheduled stops at Langley Mill in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 56.8% of recorded arrivals came within three minutes and 4.3% of stops were cancelled.
East Midlands Railway trains at Langley Mill also serve Ilkeston (4.9 km south-east, 66.6% on time, 3.5% cancelled), Newstead (9.3 km north-east, 88.2% on time, 2.7% cancelled), Hucknall (9.3 km east, 84.3% on time, 3.0% cancelled), Bulwell (9.3 km east, 87.6% on time, 2.6% cancelled), Alfreton (9.6 km north, 63.1% on time, 3.5% cancelled) and Belper (10.2 km west, 82.5% on time, 2.0% cancelled), which are the stations on its network closest to Langley Mill.
Within 30 km of here, East Midlands Railway runs best at Newstead, 9.3 km north-east (88.2%), and worst at Chesterfield, 25.2 km north (61.3%).
The busiest East Midlands Railway station within 30 km of Langley Mill is Nottingham, 14.7 km south-east, with about 276 scheduled stops a day.
East Midlands Railway at Langley Mill has slipped a little, from 60.5% within three minutes in the previous 13 periods to 56.8% in the latest 13, a fall of 3.7 percentage points. Cancellations rose to 4.3% of scheduled stops from 3.5%, which is 0.8 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 204 | 57.1% | 2.9% |
| Period 6 of 2026-27 | 188 | 47.8% | 4.3% |
| Period 5 of 2026-27 | 151 | 55.2% | 5.3% |
| Period 4 of 2026-27 | 196 | 53.5% | 4.6% |
| Period 3 of 2026-27 | 204 | 50.8% | 7.4% |
| Period 2 of 2026-27 | 204 | 50.3% | 4.4% |
| Period 1 of 2026-27 | 227 | 69.4% | 2.2% |
| Period 13 of 2025-26 | 268 | 56.8% | 3.4% |
| Period 12 of 2025-26 | 214 | 62.9% | 4.2% |
| Period 11 of 2025-26 | 203 | 67.5% | 5.9% |
| Period 10 of 2025-26 | 190 | 60.6% | 4.7% |
| Period 9 of 2025-26 | 200 | 49.5% | 5.0% |
| Period 8 of 2025-26 | 200 | 53.6% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Langley Mill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,472 | 75.3% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out