Lancing
LACSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Lancing had 69,497 scheduled stops to Period 7 of 2026-27, about 191 a day. 80.2% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Lancing opened on 24 November 1845, 181 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Shoreham-by-Sea is the oldest (1840) and East Worthing the newest (1905), with Lancing in between.
The nearest stations to Lancing are East Worthing (2.3 km west), Shoreham-by-Sea (3.7 km east), Worthing (3.8 km west), West Worthing (5.0 km west) and Southwick (6.1 km east). 10 stations lie within 10 km in all. Of the five, East Worthing is the most punctual at 83.5% and Worthing the least at 77.6%, with Lancing on 80.2%.
Lancing takes its name from a Village called Lancing, home to about 19,357 people, and the station stands 0.6 km from its centre.
For Lancing, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 73.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 89.1%, which is 16.1 percentage points higher.
2 of 3 stations of a similar size in South East are more punctual than Lancing on 80.2%. The comparison group includes Portslade (80.4%), Weybridge (83.0%) and Shoreham-by-Sea (78.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 69,497 | 80.2% | 4.6% |
Operators with their own page for this station are linked to it.
Late train at Lancing? Delay Repay
These operators call at Lancing and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,215 | 73.7% | 5.0% |
| Period 6 of 2026-27 | 5,361 | 73.0% | 5.2% |
| Period 5 of 2026-27 | 5,361 | 75.6% | 4.6% |
| Period 4 of 2026-27 | 5,389 | 80.8% | 3.6% |
| Period 3 of 2026-27 | 5,261 | 78.3% | 4.8% |
| Period 2 of 2026-27 | 5,298 | 81.1% | 7.6% |
| Period 1 of 2026-27 | 6,108 | 84.2% | 4.4% |
| Period 13 of 2025-26 | 5,631 | 86.6% | 4.5% |
| Period 12 of 2025-26 | 5,408 | 84.3% | 3.3% |
| Period 11 of 2025-26 | 5,302 | 84.5% | 3.9% |
| Period 10 of 2025-26 | 4,757 | 82.3% | 3.3% |
| Period 9 of 2025-26 | 5,250 | 76.0% | 5.5% |
| Period 8 of 2025-26 | 5,156 | 80.7% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Portslade | 69,446 | 80.4% | 4.6% |
| Weybridge | 69,921 | 83.0% | 3.6% |
| Shoreham-by-Sea | 70,032 | 78.5% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out