ScotRail at Ladybank
How this operator is doing here
ScotRail had 25,018 scheduled stops at Ladybank in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 82.3% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
ScotRail trains at Ladybank also serve Springfield (4.8 km north-east, 83.3% on time, 0.9% cancelled), Markinch (8.2 km south, 80.2% on time, 1.1% cancelled), Cupar (8.4 km north-east, 76.8% on time, 1.1% cancelled), Cameron Bridge (10.5 km south-east, 82.3% on time, 1.8% cancelled), Leven (11.7 km south-east, 83.4% on time, 1.8% cancelled) and Glenrothes with Thornton (12.5 km south, 79.2% on time, 1.6% cancelled), which are the stations on its network closest to Ladybank.
Within 30 km of here, ScotRail runs best at Dunfermline Queen Margaret, 28.5 km south-west (86.1%), and worst at Leuchars (For St. Andrews), 17.9 km north-east (76.5%).
The busiest ScotRail station within 30 km of Ladybank is Dundee, 22.3 km north-east, with about 124 scheduled stops a day.
Of the 2 operators with enough records at Ladybank, ScotRail is the most punctual, at 82.3%.
Over three full railway years ScotRail at Ladybank has improved each time, from 78.0% within three minutes in 2023-24 to 82.6% in 2024-25 and 84.7% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,894 | 74.7% | 1.1% |
| Period 6 of 2026-27 | 1,919 | 83.3% | 1.1% |
| Period 5 of 2026-27 | 1,922 | 78.5% | 1.8% |
| Period 4 of 2026-27 | 1,920 | 80.0% | 1.1% |
| Period 3 of 2026-27 | 1,918 | 84.5% | 0.9% |
| Period 2 of 2026-27 | 1,914 | 84.8% | 0.6% |
| Period 1 of 2026-27 | 2,217 | 85.4% | 0.9% |
| Period 13 of 2025-26 | 2,085 | 86.9% | 0.5% |
| Period 12 of 2025-26 | 1,912 | 82.2% | 0.7% |
| Period 11 of 2025-26 | 1,956 | 85.7% | 1.8% |
| Period 10 of 2025-26 | 1,657 | 80.2% | 1.1% |
| Period 9 of 2025-26 | 1,853 | 80.3% | 2.6% |
| Period 8 of 2025-26 | 1,851 | 82.1% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ladybank
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 692 | 49.4% | 13.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out