ScotRail at Kilmarnock
How this operator is doing here
ScotRail had 26,073 scheduled stops at Kilmarnock in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 91.6% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
ScotRail trains at Kilmarnock also serve Kilmaurs (3.3 km north-west, 91.2% on time, 2.3% cancelled), Stewarton (7.8 km north, 93.3% on time, 2.3% cancelled), Irvine (11.1 km west, 93.0% on time, 1.4% cancelled), Barassie (11.1 km south-west, 91.0% on time, 1.5% cancelled), Dunlop (11.2 km north, 93.7% on time, 2.3% cancelled) and Troon (12.5 km south-west, 92.9% on time, 1.5% cancelled), which are the stations on its network closest to Kilmarnock.
Within 30 km of here, ScotRail runs best at Neilston, 19.4 km north (97.6%), and worst at West Kilbride, 24.0 km north-west (80.9%).
The busiest ScotRail station within 30 km of Kilmarnock is Paisley Gilmour Street, 26.5 km north, with about 268 scheduled stops a day.
Of the 1 operators with enough records at Kilmarnock, ScotRail is the most punctual, at 91.6%.
For ScotRail, Kilmarnock is the 76th best of 312 ranked stations. Its 91.6% here is 3.7 percentage points above the 87.9% across the whole network.
Cancellations of ScotRail at Kilmarnock are near its usual level: 1.8% of scheduled stops, against 1.6% across its network and 1.8% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,091 | 93.2% | 1.3% |
| Period 6 of 2026-27 | 950 | 93.4% | 0.9% |
| Period 5 of 2026-27 | 2,120 | 93.6% | 1.5% |
| Period 4 of 2026-27 | 2,106 | 91.5% | 1.7% |
| Period 3 of 2026-27 | 2,120 | 93.3% | 4.1% |
| Period 2 of 2026-27 | 2,046 | 93.3% | 1.3% |
| Period 1 of 2026-27 | 2,446 | 92.1% | 2.6% |
| Period 13 of 2025-26 | 1,938 | 93.2% | 1.1% |
| Period 12 of 2025-26 | 2,112 | 94.3% | 0.7% |
| Period 11 of 2025-26 | 2,112 | 92.0% | 1.1% |
| Period 10 of 2025-26 | 1,815 | 85.5% | 1.8% |
| Period 9 of 2025-26 | 2,105 | 86.9% | 2.4% |
| Period 8 of 2025-26 | 2,112 | 89.0% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out