Acton Central
ACCLondonManaged by London Overground
How this station is performing
Acton Central had 52,257 scheduled stops to Period 7 of 2026-27, about 144 a day. 85.8% of recorded arrivals were within three minutes of the timetable and 8.3% of scheduled stops were cancelled.
Acton Central opened on 1 August 1853, 173 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ealing Broadway is the oldest (1838) and South Acton the newest (1880), with Acton Central in between.
The nearest stations to Acton Central are Acton Main Line (1.0 km north), South Acton (1.1 km south-west), Gunnersbury (2.1 km south-west), Ealing Broadway (2.7 km west) and Kew Bridge (2.7 km south-west). 77 stations lie within 10 km in all. Of the five, Kew Bridge is the most punctual at 89.8% and Ealing Broadway the least at 82.9%, with Acton Central on 85.8%.
Acton Central is named after Acton, an area of London, home to about 62,480 people, but the station stands 0.2 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Acton Central on 85.8%. The comparison group includes Gunnersbury (84.8%), Kew Gardens (85.0%) and Motspur Park (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 52,257 | 85.8% | 8.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,272 | 89.7% | 5.0% |
| Period 6 of 2026-27 | 4,131 | 84.6% | 9.5% |
| Period 5 of 2026-27 | 4,134 | 87.1% | 16.7% |
| Period 4 of 2026-27 | 4,253 | 82.4% | 14.9% |
| Period 3 of 2026-27 | 3,681 | 84.1% | 8.2% |
| Period 2 of 2026-27 | 4,246 | 85.8% | 10.5% |
| Period 1 of 2026-27 | 4,652 | 91.0% | 5.4% |
| Period 13 of 2025-26 | 4,592 | 90.4% | 3.8% |
| Period 12 of 2025-26 | 3,885 | 89.2% | 6.2% |
| Period 11 of 2025-26 | 3,803 | 87.0% | 7.4% |
| Period 10 of 2025-26 | 2,713 | 83.1% | 6.3% |
| Period 9 of 2025-26 | 3,804 | 76.9% | 9.8% |
| Period 8 of 2025-26 | 4,091 | 80.8% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gunnersbury | 52,255 | 84.8% | 9.3% |
| Kew Gardens | 52,255 | 85.0% | 9.4% |
| Motspur Park | 52,278 | 86.1% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out