East Midlands Railway at Kettering
All trains at KetteringEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 48,308 scheduled stops at Kettering in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 71.1% of recorded arrivals came within three minutes and 6.1% of stops were cancelled.
East Midlands Railway trains at Kettering also serve Wellingborough (10.6 km south, 79.2% on time, 6.1% cancelled), Corby (11.1 km north, 83.8% on time, 8.1% cancelled), Market Harborough (15.4 km north-west, 59.5% on time, 4.9% cancelled), Oakham (31.0 km north, 80.4% on time, 12.2% cancelled), Stamford (Lincs) (33.0 km north-east, – on time, 3.5% cancelled) and Bedford (33.3 km south-east, 76.2% on time, 6.3% cancelled), which are the stations on its network closest to Kettering.
Within 30 km of here, East Midlands Railway runs best at Corby, 11.1 km north (83.8%), and worst at Market Harborough, 15.4 km north-west (59.5%).
The busiest East Midlands Railway station within 30 km of Kettering is Wellingborough, 10.6 km south, with about 72 scheduled stops a day.
East Midlands Railway at Kettering has slipped a little, from 75.7% within three minutes in the previous 13 periods to 71.1% in the latest 13, a fall of 4.6 percentage points. Cancellations rose to 6.1% of scheduled stops from 3.6%, which is 2.5 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,587 | 73.2% | 5.3% |
| Period 6 of 2026-27 | 3,401 | 73.2% | 4.6% |
| Period 5 of 2026-27 | 3,260 | 67.0% | 11.3% |
| Period 4 of 2026-27 | 3,627 | 68.7% | 9.2% |
| Period 3 of 2026-27 | 3,406 | 67.4% | 8.3% |
| Period 2 of 2026-27 | 3,755 | 69.6% | 6.2% |
| Period 1 of 2026-27 | 4,347 | 70.7% | 5.5% |
| Period 13 of 2025-26 | 4,189 | 68.0% | 9.8% |
| Period 12 of 2025-26 | 3,812 | 71.8% | 4.9% |
| Period 11 of 2025-26 | 3,816 | 74.6% | 6.4% |
| Period 10 of 2025-26 | 3,503 | 74.4% | 2.8% |
| Period 9 of 2025-26 | 3,812 | 69.8% | 3.7% |
| Period 8 of 2025-26 | 3,793 | 74.6% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Kettering
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hull Trains | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out