Kemsing
KMSSouth EastManaged by Southeastern
How this station is performing
Kemsing had 11,758 scheduled stops to Period 7 of 2026-27, about 32 a day. 81.0% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Kemsing opened on 1 June 1874, 152 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bat and Ball is the oldest (1862) and Otford the newest (1882), with Kemsing in between.
The nearest stations to Kemsing are Bat and Ball (3.8 km west), Otford (3.9 km north-west), Borough Green and Wrotham (4.1 km east), Sevenoaks (5.1 km south-west) and Dunton Green (5.3 km west). 9 stations lie within 10 km in all. Of the five, Bat and Ball is the most punctual at 91.9% and Sevenoaks the least at 76.3%, with Kemsing on 81.0%.
Kemsing takes its name from a Village called Kemsing, home to about 4,327 people, and the station stands 1.9 km from its centre.
For Kemsing, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 70.5% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 91.8%, which is 21.3 percentage points higher. Cancellations peaked at 5.6% of scheduled stops in Period 10 of 2023-24, against 1.3% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Kemsing on 81.0%. The comparison group includes Denham Golf Club (90.4%), Normans Bay (79.4%) and Cooksbridge (66.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 11,758 | 81.0% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Kemsing? Delay Repay
These operators call at Kemsing and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 895 | 72.5% | 1.6% |
| Period 6 of 2026-27 | 862 | 73.0% | 1.0% |
| Period 5 of 2026-27 | 902 | 83.1% | 2.4% |
| Period 4 of 2026-27 | 895 | 85.3% | 1.8% |
| Period 3 of 2026-27 | 889 | 83.7% | 1.6% |
| Period 2 of 2026-27 | 911 | 81.3% | 1.2% |
| Period 1 of 2026-27 | 1,045 | 89.5% | 0.2% |
| Period 13 of 2025-26 | 972 | 86.5% | 0.7% |
| Period 12 of 2025-26 | 904 | 85.3% | 0.9% |
| Period 11 of 2025-26 | 900 | 83.5% | 1.7% |
| Period 10 of 2025-26 | 779 | 83.2% | 0.9% |
| Period 9 of 2025-26 | 904 | 70.5% | 1.9% |
| Period 8 of 2025-26 | 900 | 73.1% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Denham Golf Club | 11,509 | 90.4% | 1.5% |
| Normans Bay | 12,080 | 79.4% | 4.1% |
| Cooksbridge | 12,211 | 66.1% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out