Cooksbridge
CBRSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Cooksbridge had 12,211 scheduled stops to Period 7 of 2026-27, about 34 a day. 66.1% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Cooksbridge opened on 1 October 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Lewes is the oldest (1846) and Southease the newest (1906), with Cooksbridge in between.
The nearest stations to Cooksbridge are Lewes (4.0 km south), Plumpton (4.5 km north-west), Falmer (7.2 km south-west), Glynde (7.5 km south-east) and Southease (8.5 km south). 8 stations lie within 10 km in all. At 66.1%, Cooksbridge is less punctual than all of them; the best of the five, Falmer, manages 89.1%.
Cooksbridge takes its name from a Village called Cooksbridge, and the station stands 0.1 km from its centre.
Cooksbridge has slipped sharply. 66.1% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 71.9% recorded in the 13 before. Cancellations rose to 3.5% of scheduled stops from 1.6%, which is 1.9 percentage points more.
Compared with 3 stations of a similar size in South East, Cooksbridge is the least punctual, at 66.1%. All of them are ahead, including Buxted (75.7%), Hever (70.5%) and Normans Bay (79.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,211 | 66.1% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Cooksbridge? Delay Repay
These operators call at Cooksbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 898 | 55.6% | 4.7% |
| Period 6 of 2026-27 | 670 | 11.1% | 3.3% |
| Period 5 of 2026-27 | 669 | 55.4% | 9.1% |
| Period 4 of 2026-27 | 1,013 | 67.4% | 2.8% |
| Period 3 of 2026-27 | 985 | 68.2% | 4.5% |
| Period 2 of 2026-27 | 978 | 73.5% | 3.6% |
| Period 1 of 2026-27 | 1,151 | 77.8% | 2.7% |
| Period 13 of 2025-26 | 1,029 | 79.7% | 2.6% |
| Period 12 of 2025-26 | 989 | 72.0% | 0.4% |
| Period 11 of 2025-26 | 1,028 | 71.8% | 1.3% |
| Period 10 of 2025-26 | 861 | 69.7% | 4.2% |
| Period 9 of 2025-26 | 963 | 63.0% | 3.3% |
| Period 8 of 2025-26 | 977 | 68.7% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Buxted | 12,318 | 75.7% | 5.9% |
| Hever | 12,339 | 70.5% | 4.2% |
| Normans Bay | 12,080 | 79.4% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out