Elizabeth line had 35,710 scheduled stops at Iver in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 84.0% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
Elizabeth line trains at Iver also serve West Drayton (2.4 km east, 84.9% on time, 4.1% cancelled), Langley (Berks) (2.4 km west, 84.7% on time, 4.1% cancelled), Heathrow Terminal 5 (Rail Station Only) (4.2 km south, 91.0% on time, 7.7% cancelled), Heathrow Terminals 2 and 3 (Rail Station Only) (5.4 km south-east, 88.0% on time, 6.2% cancelled), Slough (5.9 km west, 84.3% on time, 3.9% cancelled) and Hayes and Harlington (6.1 km east, 85.5% on time, 4.8% cancelled), which are the stations on its network closest to Iver.
Within 30 km of here, Elizabeth line runs best at London Liverpool Street, 29.4 km east (92.5%), and worst at Twyford, 25.0 km west (82.7%).
The busiest Elizabeth line station within 30 km of Iver is London Paddington, 22.8 km east, with about 644 scheduled stops a day.
Of the 2 operators with enough records at Iver, Elizabeth line is the most punctual, at 84.0%.
For Elizabeth line, Iver is the 37th best of 41 ranked stations. Its 84.0% here is 5.6 percentage points below the 89.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,752 | 82.3% | 3.6% |
| Period 6 of 2026-27 | 2,525 | 83.9% | 5.0% |
| Period 5 of 2026-27 | 2,756 | 83.1% | 7.9% |
| Period 4 of 2026-27 | 2,756 | 87.1% | 3.2% |
| Period 3 of 2026-27 | 2,701 | 84.2% | 5.8% |
| Period 2 of 2026-27 | 2,702 | 87.6% | 5.1% |
| Period 1 of 2026-27 | 3,103 | 85.9% | 5.7% |
| Period 13 of 2025-26 | 3,035 | 87.0% | 2.5% |
| Period 12 of 2025-26 | 2,752 | 84.2% | 3.4% |
| Period 11 of 2025-26 | 2,737 | 85.0% | 6.0% |
| Period 10 of 2025-26 | 2,380 | 80.2% | 4.5% |
| Period 9 of 2025-26 | 2,754 | 79.6% | 4.2% |
| Period 8 of 2025-26 | 2,757 | 81.0% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Iver
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 594 | 80.0% | 1.8% |