London Overground at Imperial Wharf
All trains at Imperial WharfLondon Overground across BritainLondon
How this operator is doing here
London Overground had 57,438 scheduled stops at Imperial Wharf in the 13 periods to Period 7 of 2026-27, 82% of the station's total. 86.4% of recorded arrivals came within three minutes and 11.1% of stops were cancelled.
London Overground trains at Imperial Wharf also serve Clapham Junction (1.5 km south-east, 91.0% on time, 8.2% cancelled), West Brompton (1.6 km north-west, 88.1% on time, 11.1% cancelled), Battersea Park (2.5 km east, 94.3% on time, 5.6% cancelled), Kensington Olympia (3.1 km north-west, 86.7% on time, 11.0% cancelled), Wandsworth Road (3.1 km east, 92.5% on time, 4.5% cancelled) and Clapham High Street (3.6 km east, 92.4% on time, 4.5% cancelled), which are the stations on its network closest to Imperial Wharf.
Within 30 km of here, London Overground runs best at Romford, 27.6 km north-east (99.7%), and worst at Finchley Road and Frognal, 8.3 km north (75.2%).
The busiest London Overground station within 30 km of Imperial Wharf is Highbury and Islington, 9.6 km north-east, with about 593 scheduled stops a day.
Of the 2 operators with enough records at Imperial Wharf, London Overground is the least punctual, at 86.4%.
For London Overground, Imperial Wharf is the 89th best of 111 ranked stations. Its 86.4% here is 3.0 percentage points below the 89.4% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,696 | 87.7% | 7.4% |
| Period 6 of 2026-27 | 4,651 | 83.0% | 12.9% |
| Period 5 of 2026-27 | 4,678 | 87.3% | 21.0% |
| Period 4 of 2026-27 | 4,653 | 78.9% | 17.4% |
| Period 3 of 2026-27 | 4,042 | 83.7% | 15.7% |
| Period 2 of 2026-27 | 4,434 | 84.1% | 16.4% |
| Period 1 of 2026-27 | 5,041 | 88.4% | 8.5% |
| Period 13 of 2025-26 | 4,806 | 91.1% | 4.8% |
| Period 12 of 2025-26 | 4,288 | 90.2% | 6.6% |
| Period 11 of 2025-26 | 4,180 | 88.2% | 8.1% |
| Period 10 of 2025-26 | 4,021 | 89.7% | 6.9% |
| Period 9 of 2025-26 | 4,185 | 82.9% | 12.2% |
| Period 8 of 2025-26 | 3,763 | 85.4% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Imperial Wharf
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,846 | 89.6% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out