Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Imperial Wharf

All trains at Imperial WharfGTR across BritainLondon

On time, last 13 periods89.6%Whole station: 87.0%
Cancelled4.0%Whole station: 9.8%
Scheduled stops12,846Of 70,284 at the station

How this operator is doing here

GTR had 12,846 scheduled stops at Imperial Wharf in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 89.6% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.

GTR trains at Imperial Wharf also serve Clapham Junction (1.5 km south-east, 84.2% on time, 2.8% cancelled), West Brompton (1.6 km north-west, 89.5% on time, 4.1% cancelled), Battersea Park (2.5 km east, 94.1% on time, 2.8% cancelled), Kensington Olympia (3.1 km north-west, 88.4% on time, 4.2% cancelled), London Victoria (3.4 km north-east, 83.0% on time, 3.1% cancelled) and Wandsworth Common (3.5 km south-east, 93.0% on time, 2.8% cancelled), which are the stations on its network closest to Imperial Wharf.

Within 30 km of here, GTR runs best at Birkbeck, 11.8 km south-east (98.1%), and worst at Kenley, 17.7 km south (66.9%).

The busiest GTR station within 30 km of Imperial Wharf is East Croydon, 12.7 km south-east, with about 813 scheduled stops a day.

Of the 2 operators with enough records at Imperial Wharf, GTR is the most punctual, at 89.6%.

For GTR, Imperial Wharf is the 67th best of 307 ranked stations. Its 89.6% here is 6.7 percentage points above the 82.9% across the whole network.

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 91.9%Period 2 of 2023-24: 90.3%Period 3 of 2023-24: 88.6%Period 4 of 2023-24: 91.8%Period 5 of 2023-24: 90.2%Period 6 of 2023-24: 91.3%Period 7 of 2023-24: 89.1%Period 8 of 2023-24: 86.8%Period 9 of 2023-24: 88.1%Period 10 of 2023-24: 89.8%Period 11 of 2023-24: 92.8%Period 12 of 2023-24: 87.3%Period 13 of 2023-24: 89.7%Period 1 of 2024-25: 92.6%Period 2 of 2024-25: 92.8%Period 3 of 2024-25: 89.5%Period 4 of 2024-25: 89.8%Period 5 of 2024-25: 90.3%Period 6 of 2024-25: 91.1%Period 7 of 2024-25: 89.4%Period 8 of 2024-25: 88.1%Period 9 of 2024-25: 85.8%Period 10 of 2024-25: 90.7%Period 11 of 2024-25: 90.5%Period 12 of 2024-25: 90.8%Period 13 of 2024-25: 90.2%Period 1 of 2025-26: 91.9%Period 2 of 2025-26: 88.8%Period 3 of 2025-26: 89.3%Period 4 of 2025-26: 88.8%Period 5 of 2025-26: 91.6%Period 6 of 2025-26: 87.9%Period 7 of 2025-26: 89.0%Period 8 of 2025-26: 88.4%Period 9 of 2025-26: 89.4%Period 10 of 2025-26: 89.5%Period 11 of 2025-26: 88.0%Period 12 of 2025-26: 90.4%Period 13 of 2025-26: 93.4%Period 1 of 2026-27: 91.5%Period 2 of 2026-27: 87.7%Period 3 of 2026-27: 89.0%Period 4 of 2026-27: 88.9%Period 5 of 2026-27: 90.7%Period 6 of 2026-27: 87.0%Period 7 of 2026-27: 89.6%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 3.1%Period 2 of 2023-24: 1.1%Period 3 of 2023-24: 5.4%Period 4 of 2023-24: 2.2%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.8%Period 7 of 2023-24: 2.8%Period 8 of 2023-24: 1.5%Period 9 of 2023-24: 1.8%Period 10 of 2023-24: 3.1%Period 11 of 2023-24: 0.7%Period 12 of 2023-24: 2.6%Period 13 of 2023-24: 3.2%Period 1 of 2024-25: 0.8%Period 2 of 2024-25: 2.6%Period 3 of 2024-25: 5.2%Period 4 of 2024-25: 2.5%Period 5 of 2024-25: 1.5%Period 6 of 2024-25: 2.8%Period 7 of 2024-25: 2.7%Period 8 of 2024-25: 2.0%Period 9 of 2024-25: 3.5%Period 10 of 2024-25: 3.4%Period 11 of 2024-25: 2.7%Period 12 of 2024-25: 2.1%Period 13 of 2024-25: 1.9%Period 1 of 2025-26: 1.1%Period 2 of 2025-26: 0.2%Period 3 of 2025-26: 1.6%Period 4 of 2025-26: 1.2%Period 5 of 2025-26: 2.9%Period 6 of 2025-26: 4.5%Period 7 of 2025-26: 1.3%Period 8 of 2025-26: 5.5%Period 9 of 2025-26: 2.3%Period 10 of 2025-26: 2.1%Period 11 of 2025-26: 1.8%Period 12 of 2025-26: 4.4%Period 13 of 2025-26: 2.5%Period 1 of 2026-27: 1.9%Period 2 of 2026-27: 6.1%Period 3 of 2026-27: 6.0%Period 4 of 2026-27: 5.1%Period 5 of 2026-27: 10.0%Period 6 of 2026-27: 0.8%Period 7 of 2026-27: 4.4%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,00089.6%4.4%
Period 6 of 2026-271,03787.0%0.8%
Period 5 of 2026-271,00390.7%10.0%
Period 4 of 2026-271,04188.9%5.1%
Period 3 of 2026-2794789.0%6.0%
Period 2 of 2026-2796887.7%6.1%
Period 1 of 2026-271,07791.5%1.9%
Period 13 of 2025-261,15293.4%2.5%
Period 12 of 2025-261,00690.4%4.4%
Period 11 of 2025-2683188.0%1.8%
Period 10 of 2025-2695489.5%2.1%
Period 9 of 2025-2697289.4%2.3%
Period 8 of 2025-2685888.4%5.5%

Time of year

75%80%85%90%95%P1: 92.0%1P2: 89.9%2P3: 89.1%3P4: 89.8%4P5: 90.7%5P6: 89.3%6P7: 89.3%7P8: 87.7%8P9: 87.8%9P10: 90.0%10P11: 90.4%11P12: 89.5%12P13: 91.2%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Imperial Wharf

OperatorScheduled stopsWithin 3 minCancelled
London Overground57,43886.4%11.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out