TransPennine Express at Horwich Parkway
All trains at Horwich ParkwayTransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 255 scheduled stops at Horwich Parkway in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 81.6% of recorded arrivals came within three minutes and 4.3% of stops were cancelled.
TransPennine Express trains at Horwich Parkway also serve Blackrod (2.5 km north-west, – on time, – cancelled), Wigan North Western (7.3 km south-west, 69.7% on time, 8.1% cancelled), Bolton (7.6 km east, 58.3% on time, 5.0% cancelled), Chorley (10.1 km north-west, 81.1% on time, 4.3% cancelled), Buckshaw Parkway (13.2 km north-west, 90.2% on time, 4.2% cancelled) and Newton-le-Willows (14.7 km south, 76.2% on time, 3.5% cancelled), which are the stations on its network closest to Horwich Parkway.
Within 30 km of here, TransPennine Express runs best at Manchester Airport, 29.6 km south-east (77.8%), and worst at Manchester Oxford Road, 22.8 km south-east (53.6%).
The busiest TransPennine Express station within 30 km of Horwich Parkway is Manchester Piccadilly, 23.3 km south-east, with about 152 scheduled stops a day.
Of the 2 operators with enough records at Horwich Parkway, TransPennine Express is the most punctual, at 81.6%.
Cancellations of TransPennine Express at Horwich Parkway are near its usual level: 4.3% of scheduled stops, against 3.3% across its network and 4.8% for every operator at the station.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 0 | – | – |
| Period 6 of 2026-27 | 0 | – | – |
| Period 5 of 2026-27 | 0 | – | – |
| Period 4 of 2026-27 | 0 | – | – |
| Period 3 of 2026-27 | 0 | – | – |
| Period 2 of 2026-27 | 0 | – | – |
| Period 1 of 2026-27 | 255 | 81.6% | 4.3% |
| Period 13 of 2025-26 | 0 | – | – |
| Period 12 of 2025-26 | 0 | – | – |
| Period 11 of 2025-26 | 0 | – | – |
| Period 10 of 2025-26 | 0 | – | – |
| Period 9 of 2025-26 | 0 | – | – |
| Period 8 of 2025-26 | 0 | – | – |
Other operators at Horwich Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 25,310 | 60.0% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out