Northern at Horwich Parkway
All trains at Horwich ParkwayNorthern across BritainNorth West
How this operator is doing here
Northern had 25,310 scheduled stops at Horwich Parkway in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 60.0% of recorded arrivals came within three minutes and 4.8% of stops were cancelled.
Northern trains at Horwich Parkway also serve Blackrod (2.5 km north-west, 56.3% on time, 5.0% cancelled), Westhoughton (2.7 km south-east, 74.4% on time, 3.6% cancelled), Lostock (3.1 km east, 58.4% on time, 4.9% cancelled), Daisy Hill (4.6 km south, 85.7% on time, 4.2% cancelled), Hindley (4.6 km south-west, 80.6% on time, 3.1% cancelled) and Adlington (Lancashire) (5.7 km north-west, 56.3% on time, 5.1% cancelled), which are the stations on its network closest to Horwich Parkway.
Within 30 km of here, Northern runs best at Ryder Brow, 27.7 km south-east (92.5%), and worst at Moses Gate, 9.5 km east (52.6%).
The busiest Northern station within 30 km of Horwich Parkway is Manchester Piccadilly, 23.3 km south-east, with about 508 scheduled stops a day.
Of the 2 operators with enough records at Horwich Parkway, Northern is the least punctual, at 60.0%.
Over three full railway years Northern at Horwich Parkway has got worse each time, from 68.5% within three minutes in 2023-24 to 65.7% in 2024-25 and 60.3% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,925 | 60.6% | 4.8% |
| Period 6 of 2026-27 | 1,920 | 63.6% | 3.6% |
| Period 5 of 2026-27 | 1,938 | 62.3% | 5.7% |
| Period 4 of 2026-27 | 1,923 | 59.6% | 4.9% |
| Period 3 of 2026-27 | 1,916 | 58.3% | 6.1% |
| Period 2 of 2026-27 | 1,940 | 64.6% | 3.7% |
| Period 1 of 2026-27 | 2,199 | 62.3% | 3.5% |
| Period 13 of 2025-26 | 2,114 | 62.3% | 9.5% |
| Period 12 of 2025-26 | 1,941 | 64.7% | 2.8% |
| Period 11 of 2025-26 | 1,910 | 62.7% | 2.6% |
| Period 10 of 2025-26 | 1,725 | 58.5% | 7.7% |
| Period 9 of 2025-26 | 1,939 | 45.7% | 4.9% |
| Period 8 of 2025-26 | 1,920 | 54.1% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Horwich Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 255 | 81.6% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out