GTR at Honor Oak Park
How this operator is doing here
GTR had 26,869 scheduled stops at Honor Oak Park in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 91.8% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
GTR trains at Honor Oak Park also serve Crofton Park (0.8 km north-east, 92.0% on time, 4.1% cancelled), Forest Hill (1.4 km south-west, 91.7% on time, 3.8% cancelled), Catford (1.5 km south-east, 90.8% on time, 4.1% cancelled), Brockley (1.6 km north, 94.1% on time, 3.7% cancelled), Nunhead (1.9 km north, 85.6% on time, 4.2% cancelled) and Sydenham (London) (2.6 km south, 91.9% on time, 3.7% cancelled), which are the stations on its network closest to Honor Oak Park.
Within 30 km of here, GTR runs best at Beckenham Junction, 4.6 km south (98.1%), and worst at Kenley, 14.5 km south (66.9%).
The busiest GTR station within 30 km of Honor Oak Park is East Croydon, 8.9 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Honor Oak Park, GTR is the least punctual, at 91.8%.
GTR at Honor Oak Park has slipped a little, from 94.3% within three minutes in the previous 13 periods to 91.8% in the latest 13, a fall of 2.5 percentage points. Cancellations rose to 3.7% of scheduled stops from 1.8%, which is 1.9 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,084 | 91.1% | 6.8% |
| Period 6 of 2026-27 | 2,045 | 82.4% | 2.2% |
| Period 5 of 2026-27 | 2,045 | 86.3% | 4.9% |
| Period 4 of 2026-27 | 2,207 | 93.4% | 3.0% |
| Period 3 of 2026-27 | 2,124 | 92.7% | 2.3% |
| Period 2 of 2026-27 | 1,994 | 94.3% | 3.2% |
| Period 1 of 2026-27 | 2,317 | 94.6% | 4.6% |
| Period 13 of 2025-26 | 2,317 | 94.5% | 3.2% |
| Period 12 of 2025-26 | 2,021 | 93.6% | 4.3% |
| Period 11 of 2025-26 | 1,801 | 91.5% | 3.1% |
| Period 10 of 2025-26 | 1,960 | 93.2% | 2.6% |
| Period 9 of 2025-26 | 1,977 | 92.4% | 1.6% |
| Period 8 of 2025-26 | 1,977 | 93.0% | 6.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Honor Oak Park
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 103,373 | 92.1% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out