Homerton
HMNLondonManaged by London Overground
How this station is performing
Homerton had 105,808 scheduled stops to Period 7 of 2026-27, about 291 a day. 80.4% of recorded arrivals were within three minutes of the timetable and 10.5% of scheduled stops were cancelled.
Homerton opened on 1 October 1868 and closed to passengers on 15 May 1944. It reopened on 13 May 1985, 41 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Hackney Central is the oldest (1850) and Hackney Wick the newest (1980), with Homerton in between.
The nearest stations to Homerton are Hackney Central (1.0 km west), London Fields (1.2 km south-west), Hackney Downs (1.2 km west), Hackney Wick (1.4 km east) and Clapton (1.9 km north-west). 116 stations lie within 10 km in all. Of the five, London Fields is the most punctual at 93.3% and Hackney Wick the least at 78.5%, with Homerton on 80.4%.
Homerton takes its name from an area of London called Homerton, and the station stands 0.6 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Homerton on 80.4%. The comparison group includes Hackney Central (81.2%), Hackney Wick (78.5%) and Caledonian Road and Barnsbury (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 105,808 | 80.4% | 10.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,336 | 83.2% | 7.6% |
| Period 6 of 2026-27 | 8,278 | 77.4% | 12.7% |
| Period 5 of 2026-27 | 8,256 | 81.4% | 19.3% |
| Period 4 of 2026-27 | 8,256 | 76.0% | 16.8% |
| Period 3 of 2026-27 | 7,150 | 78.0% | 10.9% |
| Period 2 of 2026-27 | 8,212 | 78.8% | 13.4% |
| Period 1 of 2026-27 | 9,472 | 83.8% | 5.6% |
| Period 13 of 2025-26 | 8,948 | 84.3% | 5.3% |
| Period 12 of 2025-26 | 7,916 | 82.9% | 7.5% |
| Period 11 of 2025-26 | 7,823 | 82.1% | 9.1% |
| Period 10 of 2025-26 | 7,009 | 82.6% | 9.0% |
| Period 9 of 2025-26 | 8,030 | 74.3% | 13.5% |
| Period 8 of 2025-26 | 8,122 | 78.8% | 6.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hackney Central | 105,833 | 81.2% | 10.5% |
| Hackney Wick | 105,833 | 78.5% | 10.5% |
| Caledonian Road and Barnsbury | 105,834 | 79.3% | 9.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out