Hollingbourne
HBNSouth EastManaged by Southeastern
How this station is performing
Hollingbourne had 20,440 scheduled stops to Period 7 of 2026-27, about 56 a day. 82.0% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Hollingbourne opened on 1 July 1884, 142 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hollingbourne is the newest; the oldest, Maidstone West, opened in 1844.
The nearest stations to Hollingbourne are Bearsted (3.6 km west), Harrietsham (3.9 km south-east), Lenham (6.5 km south-east), Maidstone East (7.6 km west) and Maidstone West (7.8 km west). 7 stations lie within 10 km in all. Of the five, Maidstone West is the most punctual at 94.8% and Lenham the least at 79.0%, with Hollingbourne on 82.0%.
Hollingbourne takes its name from a Village called Hollingbourne, home to about 1,024 people, and the station stands 1.0 km from its centre.
For Hollingbourne, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 70.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 92.5%, which is 22.3 percentage points higher.
1 of 3 stations of a similar size in South East are more punctual than Hollingbourne on 82.0%. The comparison group includes Charing (Kent) (80.8%), Harrietsham (81.0%) and Amersham (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 20,440 | 82.0% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Hollingbourne? Delay Repay
These operators call at Hollingbourne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,630 | 71.6% | 1.3% |
| Period 6 of 2026-27 | 1,610 | 70.2% | 1.6% |
| Period 5 of 2026-27 | 1,669 | 81.7% | 1.6% |
| Period 4 of 2026-27 | 1,655 | 86.5% | 1.6% |
| Period 3 of 2026-27 | 1,607 | 84.6% | 2.7% |
| Period 2 of 2026-27 | 1,153 | 87.5% | 1.1% |
| Period 1 of 2026-27 | 1,796 | 89.9% | 0.4% |
| Period 13 of 2025-26 | 1,770 | 88.8% | 1.2% |
| Period 12 of 2025-26 | 1,599 | 85.5% | 0.9% |
| Period 11 of 2025-26 | 1,604 | 84.1% | 1.2% |
| Period 10 of 2025-26 | 1,251 | 82.6% | 0.9% |
| Period 9 of 2025-26 | 1,550 | 75.2% | 1.2% |
| Period 8 of 2025-26 | 1,546 | 77.0% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Charing (Kent) | 20,440 | 80.8% | 1.3% |
| Harrietsham | 20,440 | 81.0% | 1.3% |
| Amersham | 20,257 | 85.7% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out