Harrietsham
HRMSouth EastManaged by Southeastern
How this station is performing
Harrietsham had 20,440 scheduled stops to Period 7 of 2026-27, about 56 a day. 81.0% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Harrietsham opened on 1 July 1884, 142 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Harrietsham is the newest; the oldest, Headcorn, opened in 1842.
The nearest stations to Harrietsham are Lenham (2.7 km south-east), Hollingbourne (3.9 km north-west), Bearsted (7.4 km north-west), Charing (Kent) (9.1 km south-east) and Headcorn (9.4 km south). 5 stations lie within 10 km in all. Of the five, Hollingbourne is the most punctual at 82.0% and Headcorn the least at 73.6%, with Harrietsham on 81.0%.
Harrietsham takes its name from a Village called Harrietsham, home to about 3,443 people, and the station stands 0.2 km from its centre.
For Harrietsham, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 68.8% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 91.8%, which is 23.0 percentage points higher.
2 of 3 stations of a similar size in South East are more punctual than Harrietsham on 81.0%. The comparison group includes Charing (Kent) (80.8%), Hollingbourne (82.0%) and Amersham (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 20,440 | 81.0% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Harrietsham? Delay Repay
These operators call at Harrietsham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,630 | 70.2% | 1.3% |
| Period 6 of 2026-27 | 1,610 | 68.8% | 1.6% |
| Period 5 of 2026-27 | 1,669 | 80.7% | 1.6% |
| Period 4 of 2026-27 | 1,655 | 86.0% | 1.6% |
| Period 3 of 2026-27 | 1,607 | 84.1% | 2.7% |
| Period 2 of 2026-27 | 1,153 | 87.0% | 1.1% |
| Period 1 of 2026-27 | 1,796 | 89.4% | 0.4% |
| Period 13 of 2025-26 | 1,770 | 87.3% | 1.2% |
| Period 12 of 2025-26 | 1,599 | 84.6% | 0.9% |
| Period 11 of 2025-26 | 1,604 | 82.3% | 1.2% |
| Period 10 of 2025-26 | 1,251 | 81.8% | 0.9% |
| Period 9 of 2025-26 | 1,550 | 74.1% | 1.2% |
| Period 8 of 2025-26 | 1,546 | 76.4% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Charing (Kent) | 20,440 | 80.8% | 1.3% |
| Hollingbourne | 20,440 | 82.0% | 1.3% |
| Amersham | 20,257 | 85.7% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out