Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Hillfoot

HLFScotlandManaged by ScotRail

On time, last 13 periods89.5%Great Britain: 83.6%
Cancelled2.1%Great Britain: 3.2%
Stops a day84Scheduled, on average
Punctuality rank575th of 2,374Among ranked stations

How this station is performing

Hillfoot had 30,516 scheduled stops to Period 7 of 2026-27, about 84 a day. 89.5% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.

Hillfoot opened on 1 May 1900, 126 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Maryhill is the oldest (1858) and Westerton the newest (1913), with Hillfoot in between.

The nearest stations to Hillfoot are Bearsden (0.9 km south-west), Westerton (1.9 km south-west), Milngavie (2.3 km north), Maryhill (2.8 km south-east) and Summerston (2.9 km south-east). 50 stations lie within 10 km in all. Of the five, Summerston is the most punctual at 95.3% and Bearsden the least at 85.6%, with Hillfoot on 89.5%.

For Hillfoot, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 84.5% of stops arrived within three minutes of the timetable. The strongest was Period 6 of 2024-25, at 99.1%, which is 14.6 percentage points higher. Cancellations peaked at 6.4% of scheduled stops in Period 9 of 2025-26, against 2.1% over the latest 13 periods.

1 of 3 stations of a similar size in Scotland are more punctual than Hillfoot on 89.5%. The comparison group includes Bearsden (85.6%), Milngavie (87.3%) and Prestwick Town (95.1%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 5 of 2024-25: 98.5%Period 6 of 2024-25: 99.1%Period 7 of 2024-25: 98.6%Period 5 of 2025-26: 94.5%Period 6 of 2025-26: 93.1%Period 7 of 2025-26: 89.1%Period 8 of 2025-26: 85.9%Period 9 of 2025-26: 84.5%Period 10 of 2025-26: 88.4%Period 11 of 2025-26: 89.6%Period 12 of 2025-26: 90.4%Period 13 of 2025-26: 91.5%Period 1 of 2026-27: 90.5%Period 2 of 2026-27: 89.3%Period 3 of 2026-27: 92.0%Period 4 of 2026-27: 90.6%Period 5 of 2026-27: 90.4%Period 6 of 2026-27: 91.3%Period 7 of 2026-27: 88.4%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 3.9%Period 2 of 2023-24: 2.0%Period 3 of 2023-24: 3.0%Period 4 of 2023-24: 0.9%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.6%Period 7 of 2023-24: 4.4%Period 8 of 2023-24: 3.0%Period 9 of 2023-24: 2.3%Period 10 of 2023-24: 3.5%Period 11 of 2023-24: 2.6%Period 12 of 2023-24: 0.9%Period 13 of 2023-24: 1.6%Period 1 of 2024-25: 3.8%Period 2 of 2024-25: 1.2%Period 3 of 2024-25: 0.9%Period 4 of 2024-25: 2.3%Period 5 of 2024-25: 2.7%Period 6 of 2024-25: 0.7%Period 7 of 2024-25: 0.8%Period 8 of 2024-25: 4.9%Period 9 of 2024-25: 2.5%Period 10 of 2024-25: 2.6%Period 11 of 2024-25: 1.4%Period 12 of 2024-25: 1.1%Period 13 of 2024-25: 2.5%Period 1 of 2025-26: 2.4%Period 2 of 2025-26: 1.6%Period 3 of 2025-26: 1.0%Period 4 of 2025-26: 5.9%Period 5 of 2025-26: 5.4%Period 6 of 2025-26: 1.9%Period 7 of 2025-26: 2.7%Period 8 of 2025-26: 2.3%Period 9 of 2025-26: 6.4%Period 10 of 2025-26: 2.2%Period 11 of 2025-26: 1.9%Period 12 of 2025-26: 1.1%Period 13 of 2025-26: 1.6%Period 1 of 2026-27: 1.8%Period 2 of 2026-27: 1.1%Period 3 of 2026-27: 0.7%Period 4 of 2026-27: 2.7%Period 5 of 2026-27: 1.5%Period 6 of 2026-27: 1.0%Period 7 of 2026-27: 3.7%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail30,51689.5%2.1%

Operators with their own page for this station are linked to it.

Late train at Hillfoot? Delay Repay

These operators call at Hillfoot and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,32488.4%3.7%
Period 6 of 2026-272,32491.3%1.0%
Period 5 of 2026-272,32490.4%1.5%
Period 4 of 2026-272,32490.6%2.7%
Period 3 of 2026-272,32492.0%0.7%
Period 2 of 2026-272,32489.3%1.1%
Period 1 of 2026-272,66590.5%1.8%
Period 13 of 2025-262,56491.5%1.6%
Period 12 of 2025-262,32490.4%1.1%
Period 11 of 2025-262,32489.6%1.9%
Period 10 of 2025-262,04188.4%2.2%
Period 9 of 2025-262,33084.5%6.4%
Period 8 of 2025-262,32485.9%2.3%

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Bearsden30,51685.6%2.1%
Milngavie30,51687.3%2.1%
Prestwick Town30,34895.1%1.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out