How this operator is doing here
London Overground had 215,851 scheduled stops at Highbury and Islington in the 13 periods to Period 7 of 2026-27, 75% of the station's total. 89.5% of recorded arrivals came within three minutes and 6.3% of stops were cancelled.
London Overground trains at Highbury and Islington also serve Canonbury (0.8 km east, 86.0% on time, 6.9% cancelled), Caledonian Road and Barnsbury (0.9 km south-west, 79.3% on time, 9.0% cancelled), Dalston Kingsland (1.9 km east, 81.8% on time, 10.3% cancelled), Dalston Junction (2.0 km east, 92.0% on time, 4.1% cancelled), Haggerston (2.1 km south-east, 91.4% on time, 3.9% cancelled) and Hoxton (2.5 km south-east, 91.9% on time, 3.9% cancelled), which are the stations on its network closest to Highbury and Islington.
Within 30 km of here, London Overground runs best at Romford, 20.0 km east (99.7%), and worst at Finchley Road and Frognal, 5.5 km west (75.2%).
The busiest London Overground station within 30 km of Highbury and Islington is Canonbury, 0.8 km east, with about 593 scheduled stops a day.
Of the 2 operators with enough records at Highbury and Islington, London Overground is the least punctual, at 89.5%.
For London Overground, Highbury and Islington ranks 75th of 111 stations and is typical: 89.5% here against 89.4% across the network, a difference of 0.1 percentage points.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 16,784 | 90.8% | 4.4% |
| Period 6 of 2026-27 | 16,661 | 88.0% | 7.9% |
| Period 5 of 2026-27 | 16,472 | 89.0% | 14.2% |
| Period 4 of 2026-27 | 16,632 | 87.3% | 10.2% |
| Period 3 of 2026-27 | 15,616 | 88.8% | 6.1% |
| Period 2 of 2026-27 | 16,350 | 89.3% | 7.6% |
| Period 1 of 2026-27 | 19,166 | 91.7% | 3.8% |
| Period 13 of 2025-26 | 17,721 | 92.3% | 3.5% |
| Period 12 of 2025-26 | 16,394 | 91.4% | 4.2% |
| Period 11 of 2025-26 | 16,199 | 89.9% | 5.2% |
| Period 10 of 2025-26 | 14,943 | 90.5% | 4.5% |
| Period 9 of 2025-26 | 16,468 | 85.5% | 7.2% |
| Period 8 of 2025-26 | 16,445 | 87.6% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Highbury and Islington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 70,116 | 90.2% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out