GTR had 70,116 scheduled stops at Highbury and Islington in the 13 periods to Period 7 of 2026-27, 25% of the station's total. 90.2% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
GTR trains at Highbury and Islington also serve Drayton Park (0.8 km north, 90.6% on time, 4.6% cancelled), Essex Road (0.8 km south-east, 91.8% on time, 4.9% cancelled), London Kings Cross (2.1 km south-west, 79.9% on time, 6.9% cancelled), Finsbury Park (2.1 km north, 82.2% on time, 5.3% cancelled), London St Pancras International (2.2 km south-west, 80.0% on time, 5.7% cancelled) and Kentish Town (2.5 km west, 83.3% on time, 6.8% cancelled), which are the stations on its network closest to Highbury and Islington.
Within 30 km of here, GTR runs best at Beckenham Junction, 16.0 km south (98.1%), and worst at Kenley, 24.7 km south (66.9%).
The busiest GTR station within 30 km of Highbury and Islington is East Croydon, 19.0 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Highbury and Islington, GTR is the most punctual, at 90.2%.
For GTR, Highbury and Islington is the 58th best of 307 ranked stations. Its 90.2% here is 7.3 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,472 | 88.6% | 5.0% |
| Period 6 of 2026-27 | 5,412 | 77.9% | 9.1% |
| Period 5 of 2026-27 | 5,350 | 90.3% | 7.2% |
| Period 4 of 2026-27 | 5,485 | 90.2% | 6.3% |
| Period 3 of 2026-27 | 5,395 | 92.0% | 7.3% |
| Period 2 of 2026-27 | 5,232 | 91.4% | 5.3% |
| Period 1 of 2026-27 | 6,152 | 93.5% | 4.3% |
| Period 13 of 2025-26 | 6,062 | 93.2% | 2.9% |
| Period 12 of 2025-26 | 4,929 | 93.8% | 2.1% |
| Period 11 of 2025-26 | 5,357 | 93.4% | 2.9% |
| Period 10 of 2025-26 | 4,469 | 92.8% | 4.6% |
| Period 9 of 2025-26 | 5,349 | 85.7% | 5.5% |
| Period 8 of 2025-26 | 5,452 | 89.1% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Highbury and Islington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 215,851 | 89.5% | 6.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out