Chiltern Railways at Heyford
All trains at HeyfordChiltern Railways across BritainSouth East
On time, last 13 periods–Whole station: 76.1%
Cancelled–Whole station: 2.2%
Scheduled stops221Of 7,527 at the station
How this operator is doing here
There are not enough usable records of Chiltern Railways at Heyford to report how punctual it is.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 17 | – | – |
| Period 6 of 2026-27 | 19 | – | – |
| Period 5 of 2026-27 | 16 | – | – |
| Period 4 of 2026-27 | 18 | – | – |
| Period 3 of 2026-27 | 17 | – | – |
| Period 2 of 2026-27 | 14 | – | – |
| Period 1 of 2026-27 | 20 | – | – |
| Period 13 of 2025-26 | 21 | – | – |
| Period 12 of 2025-26 | 16 | – | – |
| Period 11 of 2025-26 | 19 | – | – |
| Period 10 of 2025-26 | 12 | – | – |
| Period 9 of 2025-26 | 15 | – | – |
| Period 8 of 2025-26 | 17 | – | – |
Other operators at Heyford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 7,306 | 75.5% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out