South Western Railway at Hedge End
All trains at Hedge EndSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 13,984 scheduled stops at Hedge End in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 71.0% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
South Western Railway trains at Hedge End also serve Botley (3.0 km south-east, 70.5% on time, 2.6% cancelled), Southampton Airport Parkway (5.3 km north-west, 68.4% on time, 3.2% cancelled), Bursledon (5.5 km south, 78.7% on time, 1.7% cancelled), Eastleigh (5.6 km north-west, 71.6% on time, 2.9% cancelled), Swaythling (5.8 km west, 75.4% on time, 2.5% cancelled) and Bitterne (6.0 km west, 77.5% on time, 1.5% cancelled), which are the stations on its network closest to Hedge End.
Within 30 km of here, South Western Railway runs best at Ryde St Johns Road, 25.1 km south-east (98.7%), and worst at Micheldever, 27.9 km north (65.6%).
The busiest South Western Railway station within 30 km of Hedge End is Southampton Central, 8.8 km west, with about 189 scheduled stops a day.
South Western Railway at Hedge End has slipped sharply. 71.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 76.8% recorded in the 13 before. Cancellations rose to 2.6% of scheduled stops from 2.1%, which is 0.5 percentage points more.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,066 | 61.9% | 3.1% |
| Period 6 of 2026-27 | 1,036 | 67.8% | 0.9% |
| Period 5 of 2026-27 | 1,105 | 72.1% | 3.0% |
| Period 4 of 2026-27 | 1,074 | 67.9% | 3.3% |
| Period 3 of 2026-27 | 1,086 | 74.8% | 2.3% |
| Period 2 of 2026-27 | 1,071 | 67.4% | 4.8% |
| Period 1 of 2026-27 | 1,121 | 76.4% | 2.5% |
| Period 13 of 2025-26 | 1,124 | 86.0% | 1.2% |
| Period 12 of 2025-26 | 1,038 | 75.6% | 3.5% |
| Period 11 of 2025-26 | 1,112 | 75.8% | 3.8% |
| Period 10 of 2025-26 | 934 | 68.2% | 2.4% |
| Period 9 of 2025-26 | 1,107 | 59.9% | 1.9% |
| Period 8 of 2025-26 | 1,110 | 68.3% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hedge End
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 26 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out