Hedge End
HDESouth EastManaged by South Western Railway
How this station is performing
Hedge End had 14,010 scheduled stops to Period 7 of 2026-27, about 38 a day. 71.0% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Hedge End opened on 14 May 1990, 36 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hedge End is the newest; the oldest, Eastleigh, opened in 1839.
The nearest stations to Hedge End are Botley (3.0 km south-east), Southampton Airport Parkway (5.3 km north-west), Bursledon (5.5 km south), Eastleigh (5.6 km north-west) and Swaythling (5.8 km west). 14 stations lie within 10 km in all. Of the five, Bursledon is the most punctual at 78.7% and Southampton Airport Parkway the least at 67.0%, with Hedge End on 71.0%.
Hedge End takes its name from a town called Hedge End, home to about 22,527 people, and the station stands 2.2 km from its centre.
Hedge End has slipped sharply. 71.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.7 percentage points worse than the 76.7% recorded in the 13 before. Cancellations held steady at 2.6% of scheduled stops, against 2.2% before.
2 of 3 stations of a similar size in South East are more punctual than Hedge End on 71.0%. The comparison group includes Botley (70.5%), Midgham (78.5%) and Kintbury (79.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 13,984 | 71.0% | 2.6% |
| Great Western Railway | 26 | – | – |
Operators with their own page for this station are linked to it.
Late train at Hedge End? Delay Repay
These operators call at Hedge End and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,067 | 62.0% | 3.1% |
| Period 6 of 2026-27 | 1,039 | 67.8% | 0.9% |
| Period 5 of 2026-27 | 1,109 | 72.1% | 3.0% |
| Period 4 of 2026-27 | 1,077 | 68.0% | 3.2% |
| Period 3 of 2026-27 | 1,090 | 74.8% | 2.3% |
| Period 2 of 2026-27 | 1,072 | 67.3% | 4.8% |
| Period 1 of 2026-27 | 1,121 | 76.4% | 2.5% |
| Period 13 of 2025-26 | 1,125 | 86.0% | 1.2% |
| Period 12 of 2025-26 | 1,038 | 75.6% | 3.5% |
| Period 11 of 2025-26 | 1,116 | 75.8% | 3.9% |
| Period 10 of 2025-26 | 936 | 68.3% | 2.4% |
| Period 9 of 2025-26 | 1,108 | 59.8% | 1.9% |
| Period 8 of 2025-26 | 1,112 | 68.3% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out