Kintbury
KITSouth EastManaged by Great Western Railway
How this station is performing
Kintbury had 13,920 scheduled stops to Period 7 of 2026-27, about 38 a day. 79.9% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Kintbury opened on 21 December 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kintbury is the oldest; the next oldest, Hungerford, dates from 1847.
The nearest stations to Kintbury are Hungerford (4.8 km west), Newbury (8.5 km east), Newbury Racecourse (9.6 km east), Bedwyn (11.0 km west) and Thatcham (14.0 km east). 3 stations lie within 10 km in all. At 79.9%, Kintbury is more punctual than every one of them; the best of the five, Bedwyn, manages 78.4%.
Kintbury takes its name from a Village called Kintbury, home to about 2,599 people, and the station stands 0.5 km from its centre.
For Kintbury, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 63.7% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2025-26, at 88.1%, which is 24.4 percentage points higher. Cancellations peaked at 14.4% of scheduled stops in Period 10 of 2023-24, against 3.0% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Kintbury on 79.9%. The comparison group includes Midgham (78.5%), Swale (90.6%) and Botley (70.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 13,920 | 79.9% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Kintbury? Delay Repay
These operators call at Kintbury and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,073 | 84.5% | 3.2% |
| Period 6 of 2026-27 | 1,057 | 77.8% | 3.5% |
| Period 5 of 2026-27 | 1,081 | 75.6% | 3.1% |
| Period 4 of 2026-27 | 1,074 | 63.7% | 6.2% |
| Period 3 of 2026-27 | 944 | 80.1% | 4.8% |
| Period 2 of 2026-27 | 1,071 | 82.6% | 3.2% |
| Period 1 of 2026-27 | 1,233 | 84.3% | 1.9% |
| Period 13 of 2025-26 | 1,172 | 87.3% | 2.0% |
| Period 12 of 2025-26 | 1,060 | 85.8% | 1.3% |
| Period 11 of 2025-26 | 1,076 | 84.9% | 2.6% |
| Period 10 of 2025-26 | 945 | 83.8% | 2.4% |
| Period 9 of 2025-26 | 1,060 | 69.9% | 2.1% |
| Period 8 of 2025-26 | 1,074 | 77.0% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out