Headingley
HDYYorkshire and The HumberManaged by Northern Trains
How this station is performing
Headingley had 27,024 scheduled stops to Period 7 of 2026-27, about 74 a day. 78.3% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Headingley opened on 10 July 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Leeds is the oldest (1846) and Burley Park the newest (1988), with Headingley in between.
The nearest stations to Headingley are Burley Park (1.3 km south-east), Kirkstall Forge (2.3 km west), Bramley (West Yorkshire) (3.1 km south-west), Leeds (4.0 km south-east) and Horsforth (4.1 km north-west). 10 stations lie within 10 km in all. Of the five, Kirkstall Forge is the most punctual at 85.1% and Bramley (West Yorkshire) the least at 71.3%, with Headingley on 78.3%.
Headingley takes its name from a suburb called Headingley, and the station stands 1.2 km from its centre.
Headingley improved sharply over the past year. In the latest 13 periods 78.3% of stops came within three minutes of the timetable, up 9.4 percentage points from 68.9% in the 13 before. Cancellations held steady at 3.0% of scheduled stops, against 3.4% before.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Headingley is the most punctual, at 78.3%. The comparison group includes Burley Park (74.7%), Hornbeam Park (76.4%) and Outwood (72.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 27,024 | 78.3% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,078 | 77.3% | 2.5% |
| Period 6 of 2026-27 | 2,078 | 87.2% | 3.1% |
| Period 5 of 2026-27 | 2,100 | 84.0% | 3.0% |
| Period 4 of 2026-27 | 2,067 | 81.1% | 3.6% |
| Period 3 of 2026-27 | 2,043 | 78.0% | 6.5% |
| Period 2 of 2026-27 | 2,067 | 84.2% | 4.1% |
| Period 1 of 2026-27 | 2,378 | 86.2% | 2.5% |
| Period 13 of 2025-26 | 2,170 | 86.5% | 0.6% |
| Period 12 of 2025-26 | 2,072 | 84.5% | 1.5% |
| Period 11 of 2025-26 | 2,072 | 81.1% | 2.5% |
| Period 10 of 2025-26 | 1,876 | 71.6% | 2.1% |
| Period 9 of 2025-26 | 2,023 | 47.5% | 6.5% |
| Period 8 of 2025-26 | 2,000 | 64.4% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Burley Park | 27,024 | 74.7% | 3.0% |
| Hornbeam Park | 27,036 | 76.4% | 3.0% |
| Outwood | 26,851 | 72.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out