Burley Park
BUYYorkshire and The HumberManaged by Northern Trains
How this station is performing
Burley Park had 27,024 scheduled stops to Period 7 of 2026-27, about 74 a day. 74.7% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Burley Park opened on 28 November 1988, 38 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Burley Park is the newest; the oldest, Leeds, opened in 1846.
The nearest stations to Burley Park are Headingley (1.3 km north-west), Leeds (2.7 km south-east), Kirkstall Forge (3.6 km north-west), Bramley (West Yorkshire) (4.0 km west) and Cottingley (4.9 km south). 10 stations lie within 10 km in all. Of the five, Kirkstall Forge is the most punctual at 85.1% and Bramley (West Yorkshire) the least at 71.3%, with Burley Park on 74.7%.
Burley Park is named after Burley, an inner suburb, but the station stands 0.7 km from its centre.
Burley Park improved sharply over the past year. In the latest 13 periods 74.7% of stops came within three minutes of the timetable, up 8.5 percentage points from 66.2% in the 13 before. Cancellations held steady at 3.0% of scheduled stops, against 3.4% before.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Burley Park on 74.7%. The comparison group includes Headingley (78.3%), Hornbeam Park (76.4%) and Outwood (72.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 27,024 | 74.7% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,078 | 74.3% | 2.5% |
| Period 6 of 2026-27 | 2,078 | 83.0% | 3.2% |
| Period 5 of 2026-27 | 2,100 | 81.6% | 3.0% |
| Period 4 of 2026-27 | 2,067 | 77.3% | 3.6% |
| Period 3 of 2026-27 | 2,043 | 72.3% | 6.5% |
| Period 2 of 2026-27 | 2,067 | 81.2% | 4.1% |
| Period 1 of 2026-27 | 2,378 | 83.6% | 2.5% |
| Period 13 of 2025-26 | 2,170 | 82.5% | 0.6% |
| Period 12 of 2025-26 | 2,072 | 79.8% | 1.5% |
| Period 11 of 2025-26 | 2,072 | 76.9% | 2.4% |
| Period 10 of 2025-26 | 1,876 | 68.1% | 2.1% |
| Period 9 of 2025-26 | 2,023 | 45.4% | 6.5% |
| Period 8 of 2025-26 | 2,000 | 60.0% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Headingley | 27,024 | 78.3% | 3.0% |
| Hornbeam Park | 27,036 | 76.4% | 3.0% |
| Outwood | 26,851 | 72.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out