Merseyrail at Headbolt Lane
All trains at Headbolt LaneMerseyrail across BritainNorth West
How this operator is doing here
Merseyrail had 43,203 scheduled stops at Headbolt Lane in the 13 periods to Period 7 of 2026-27, 83% of the station's total. 89.2% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Merseyrail trains at Headbolt Lane also serve Kirkby (Merseyside) (1.4 km south-west, 89.4% on time, 1.8% cancelled), Maghull (3.5 km north-west, 92.3% on time, 1.6% cancelled), Maghull North (3.7 km north-west, 95.9% on time, 1.7% cancelled), Fazakerley (4.3 km south-west, 87.6% on time, 1.8% cancelled), Old Roan (4.5 km west, 95.4% on time, 1.5% cancelled) and Aintree (5.2 km west, 94.0% on time, 1.5% cancelled), which are the stations on its network closest to Headbolt Lane.
Within 30 km of here, Merseyrail runs best at Wallasey Grove Road, 14.2 km south-west (99.3%), and worst at Leasowe, 17.1 km south-west (72.4%).
The busiest Merseyrail station within 30 km of Headbolt Lane is Liverpool Central, 11.6 km south-west, with about 582 scheduled stops a day.
Of the 2 operators with enough records at Headbolt Lane, Merseyrail is the most punctual, at 89.2%.
For Merseyrail, Headbolt Lane is the 49th best of 62 ranked stations. Its 89.2% here is 2.3 percentage points below the 91.5% across the whole network.
Period by period
See how Merseyrail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,308 | 92.7% | 1.4% |
| Period 6 of 2026-27 | 3,327 | 92.4% | 0.9% |
| Period 5 of 2026-27 | 3,308 | 90.6% | 1.1% |
| Period 4 of 2026-27 | 3,266 | 88.1% | 1.2% |
| Period 3 of 2026-27 | 3,092 | 90.1% | 5.0% |
| Period 2 of 2026-27 | 3,321 | 91.9% | 1.2% |
| Period 1 of 2026-27 | 3,660 | 90.3% | 4.3% |
| Period 13 of 2025-26 | 3,639 | 90.6% | 1.4% |
| Period 12 of 2025-26 | 3,315 | 87.0% | 0.8% |
| Period 11 of 2025-26 | 3,326 | 86.2% | 2.0% |
| Period 10 of 2025-26 | 3,002 | 88.7% | 0.7% |
| Period 9 of 2025-26 | 3,310 | 85.7% | 1.5% |
| Period 8 of 2025-26 | 3,329 | 85.5% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Headbolt Lane
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 8,846 | 88.7% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out