Hatfield (Herts)
HATEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Hatfield (Herts) had 63,952 scheduled stops to Period 7 of 2026-27, about 176 a day. 86.5% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Hatfield (Herts) opened on 7 August 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hatfield (Herts) is the oldest; the next oldest, Welwyn North, dates from 1850.
The nearest stations to Hatfield (Herts) are Welham Green (3.2 km south), Welwyn Garden City (4.1 km north), Brookmans Park (5.0 km south), Welwyn North (6.8 km north) and Potters Bar (7.7 km south). 11 stations lie within 10 km in all. Of the five, Welham Green is the most punctual at 89.3% and Welwyn North the least at 72.5%, with Hatfield (Herts) on 86.5%.
Hatfield (Herts) is named after Hatfield, a new town (UK), home to about 43,090 people, but the station stands 0.7 km from its centre.
1 of 3 stations of a similar size in East of England are more punctual than Hatfield (Herts) on 86.5%. The comparison group includes Chelmsford (88.6%), Ely (68.5%) and Welwyn Garden City (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 63,952 | 86.5% | 5.3% |
Operators with their own page for this station are linked to it.
Late train at Hatfield (Herts)? Delay Repay
These operators call at Hatfield (Herts) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,101 | 83.8% | 4.8% |
| Period 6 of 2026-27 | 4,862 | 81.8% | 9.4% |
| Period 5 of 2026-27 | 4,929 | 85.9% | 6.0% |
| Period 4 of 2026-27 | 5,054 | 83.0% | 6.4% |
| Period 3 of 2026-27 | 4,989 | 88.7% | 6.6% |
| Period 2 of 2026-27 | 4,981 | 88.8% | 7.0% |
| Period 1 of 2026-27 | 5,772 | 90.1% | 3.7% |
| Period 13 of 2025-26 | 5,394 | 88.9% | 2.8% |
| Period 12 of 2025-26 | 4,284 | 88.5% | 2.8% |
| Period 11 of 2025-26 | 4,559 | 87.3% | 4.7% |
| Period 10 of 2025-26 | 4,118 | 88.9% | 3.9% |
| Period 9 of 2025-26 | 4,799 | 81.0% | 6.7% |
| Period 8 of 2025-26 | 5,110 | 87.2% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chelmsford | 64,247 | 88.6% | 1.2% |
| Ely | 64,257 | 68.5% | 5.8% |
| Welwyn Garden City | 64,770 | 85.0% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out