Chelmsford
CHMEast of EnglandManaged by Greater Anglia
How this station is performing
Chelmsford had 64,247 scheduled stops to Period 7 of 2026-27, about 176 a day. 88.6% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Chelmsford opened on 29 March 1843, 183 years before the latest figures here, and has not been moved since. Of the 4 stations nearest to it with a known opening date, Chelmsford is the oldest; the next oldest, Ingatestone, dates from 1843.
The nearest stations to Chelmsford are Beaulieu Park (4.2 km north-east), Ingatestone (9.7 km south-west), Hatfield Peverel (9.8 km north-east), Billericay (12.5 km south) and South Woodham Ferrers (13.5 km south-east). 3 stations lie within 10 km in all. At 88.6%, Chelmsford is less punctual than all of them; the best of the five, Ingatestone, manages 89.9%.
Chelmsford takes its name from a city called Chelmsford, home to about 115,369 people, and the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Chelmsford was Period 6 of 2025-26, at 69.9%, some time before the latest year. The strongest was Period 5 of 2023-24, at 95.5%, and the two are 25.6 percentage points apart.
Compared with 3 stations of a similar size in East of England, Chelmsford is the most punctual, at 88.6%. The comparison group includes Ely (68.5%), Hatfield (Herts) (86.5%) and Welwyn Garden City (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 64,247 | 88.6% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Chelmsford? Delay Repay
These operators call at Chelmsford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,010 | 87.0% | 0.8% |
| Period 6 of 2026-27 | 4,957 | 85.9% | 0.3% |
| Period 5 of 2026-27 | 4,967 | 85.3% | 2.9% |
| Period 4 of 2026-27 | 4,976 | 89.2% | 1.9% |
| Period 3 of 2026-27 | 4,976 | 88.1% | 1.0% |
| Period 2 of 2026-27 | 4,960 | 89.4% | 0.4% |
| Period 1 of 2026-27 | 5,688 | 89.1% | 2.4% |
| Period 13 of 2025-26 | 5,490 | 90.6% | 1.7% |
| Period 12 of 2025-26 | 4,689 | 89.4% | 0.2% |
| Period 11 of 2025-26 | 4,092 | 90.7% | 0.5% |
| Period 10 of 2025-26 | 4,447 | 89.6% | 1.4% |
| Period 9 of 2025-26 | 4,987 | 88.8% | 0.8% |
| Period 8 of 2025-26 | 5,008 | 89.2% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ely | 64,257 | 68.5% | 5.8% |
| Hatfield (Herts) | 63,952 | 86.5% | 5.3% |
| Welwyn Garden City | 64,770 | 85.0% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out