Broxbourne
BXBEast of EnglandManaged by Greater Anglia
How this station is performing
Broxbourne had 79,029 scheduled stops to Period 7 of 2026-27, about 217 a day. 88.0% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Broxbourne opened on 15 September 1840. It was moved to the site it uses now on 3 November 1960. Of the 5 stations nearest to it with a known opening date, Broxbourne is the oldest; the next oldest, Roydon, dates from 1841.
The nearest stations to Broxbourne are Rye House (2.7 km north-east), Roydon (4.5 km north-east), St Margarets (Herts) (4.6 km north), Cheshunt (5.0 km south) and Bayford (6.0 km west). 15 stations lie within 10 km in all. At 88.0%, Broxbourne is less punctual than all of them; the best of the five, St Margarets (Herts), manages 91.0%.
Broxbourne takes its name from a town called Broxbourne, home to about 15,303 people, and the station stands 0.8 km from its centre.
Broxbourne has slipped a little, from 91.0% within three minutes in the previous 13 periods to 88.0% in the latest 13, a fall of 3.0 percentage points. Cancellations held steady at 2.5% of scheduled stops, against 2.4% before.
1 of 3 stations of a similar size in East of England are more punctual than Broxbourne on 88.0%. The comparison group includes Harlow Town (87.6%), Ipswich (91.2%) and Harpenden (80.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 79,029 | 88.0% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Broxbourne? Delay Repay
These operators call at Broxbourne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,883 | 87.2% | 2.8% |
| Period 6 of 2026-27 | 6,096 | 86.3% | 2.6% |
| Period 5 of 2026-27 | 6,088 | 83.6% | 4.5% |
| Period 4 of 2026-27 | 5,876 | 85.9% | 2.9% |
| Period 3 of 2026-27 | 6,167 | 85.7% | 3.2% |
| Period 2 of 2026-27 | 5,790 | 91.2% | 1.5% |
| Period 1 of 2026-27 | 7,024 | 92.0% | 2.8% |
| Period 13 of 2025-26 | 6,732 | 89.2% | 1.4% |
| Period 12 of 2025-26 | 6,130 | 88.1% | 3.2% |
| Period 11 of 2025-26 | 6,094 | 90.2% | 1.3% |
| Period 10 of 2025-26 | 5,031 | 91.2% | 1.8% |
| Period 9 of 2025-26 | 6,116 | 84.2% | 1.8% |
| Period 8 of 2025-26 | 6,002 | 88.5% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harlow Town | 79,025 | 87.6% | 2.7% |
| Ipswich | 78,596 | 91.2% | 1.0% |
| Harpenden | 79,665 | 80.1% | 5.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out