Gunnislake
GSLSouth WestManaged by Great Western Railway
How this station is performing
Gunnislake had 6,102 scheduled stops to Period 7 of 2026-27, about 17 a day. 85.8% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Gunnislake opened on 2 March 1908, 118 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Gunnislake is the newest; the oldest, Saltash, opened in 1859.
The nearest stations to Gunnislake are Calstock (2.2 km south), Bere Alston (3.7 km south), Bere Ferrers (7.8 km south), Saltash (12.2 km south) and St Budeaux Victoria Road (12.9 km south). 3 stations lie within 10 km in all. At 85.8%, Gunnislake is more punctual than every one of them; the best of the five, Calstock, manages 85.5%.
Gunnislake takes its name from a Village called Gunnislake, and the station stands 0.9 km from its centre.
Gunnislake has slipped a little, from 89.7% within three minutes in the previous 13 periods to 85.8% in the latest 13, a fall of 3.9 percentage points. Cancellations fell to 2.7% of scheduled stops from 3.2%, which is 0.5 percentage points fewer.
Compared with 3 stations of a similar size in South West, Gunnislake is the most punctual, at 85.8%. The comparison group includes Calstock (85.5%), Melksham (75.5%) and Bere Alston (82.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,102 | 85.8% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Gunnislake? Delay Repay
These operators call at Gunnislake and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 89.6% | 0.4% |
| Period 6 of 2026-27 | 472 | 86.7% | 3.0% |
| Period 5 of 2026-27 | 474 | 80.0% | 6.3% |
| Period 4 of 2026-27 | 472 | 80.8% | 5.1% |
| Period 3 of 2026-27 | 472 | 83.0% | 3.8% |
| Period 2 of 2026-27 | 468 | 85.4% | 3.2% |
| Period 1 of 2026-27 | 534 | 87.5% | 0.7% |
| Period 13 of 2025-26 | 510 | 93.3% | 0.8% |
| Period 12 of 2025-26 | 464 | 93.1% | 0.6% |
| Period 11 of 2025-26 | 464 | 90.0% | 2.6% |
| Period 10 of 2025-26 | 380 | 79.4% | 5.3% |
| Period 9 of 2025-26 | 464 | 81.7% | 2.2% |
| Period 8 of 2025-26 | 464 | 82.0% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Calstock | 6,102 | 85.5% | 2.7% |
| Melksham | 6,071 | 75.5% | 6.1% |
| Bere Alston | 6,134 | 82.5% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out