Calstock
CSKSouth WestManaged by Great Western Railway
How this station is performing
Calstock had 6,102 scheduled stops to Period 7 of 2026-27, about 17 a day. 85.5% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Calstock opened on 2 March 1908, 118 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Calstock is the newest; the oldest, Saltash, opened in 1859.
The nearest stations to Calstock are Bere Alston (1.5 km south-east), Gunnislake (2.2 km north), Bere Ferrers (5.6 km south), Saltash (10.1 km south) and St Budeaux Victoria Road (10.8 km south). 3 stations lie within 10 km in all. Of the five, Gunnislake is the most punctual at 85.8% and Saltash the least at 70.5%, with Calstock on 85.5%.
Calstock takes its name from a Village called Calstock, home to about 6,648 people, and the station stands 0.1 km from its centre.
Calstock has slipped a little, from 90.4% within three minutes in the previous 13 periods to 85.5% in the latest 13, a fall of 4.9 percentage points. Cancellations fell to 2.7% of scheduled stops from 3.2%, which is 0.5 percentage points fewer.
1 of 3 stations of a similar size in South West are more punctual than Calstock on 85.5%. The comparison group includes Gunnislake (85.8%), Melksham (75.5%) and Bere Alston (82.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,102 | 85.5% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Calstock? Delay Repay
These operators call at Calstock and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 87.8% | 0.4% |
| Period 6 of 2026-27 | 472 | 85.3% | 3.0% |
| Period 5 of 2026-27 | 474 | 79.6% | 6.3% |
| Period 4 of 2026-27 | 472 | 79.8% | 4.9% |
| Period 3 of 2026-27 | 472 | 81.3% | 3.8% |
| Period 2 of 2026-27 | 468 | 86.3% | 3.2% |
| Period 1 of 2026-27 | 534 | 88.2% | 0.7% |
| Period 13 of 2025-26 | 510 | 92.8% | 0.8% |
| Period 12 of 2025-26 | 464 | 92.6% | 0.6% |
| Period 11 of 2025-26 | 464 | 89.1% | 2.6% |
| Period 10 of 2025-26 | 380 | 81.2% | 5.3% |
| Period 9 of 2025-26 | 464 | 80.9% | 2.2% |
| Period 8 of 2025-26 | 464 | 83.3% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gunnislake | 6,102 | 85.8% | 2.7% |
| Melksham | 6,071 | 75.5% | 6.1% |
| Bere Alston | 6,134 | 82.5% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out