Bere Alston
BASSouth WestManaged by Great Western Railway
How this station is performing
Bere Alston had 6,134 scheduled stops to Period 7 of 2026-27, about 17 a day. 82.5% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Bere Alston opened on 2 June 1890, 136 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Saltash is the oldest (1859) and Gunnislake the newest (1908), with Bere Alston in between.
The nearest stations to Bere Alston are Calstock (1.5 km north-west), Gunnislake (3.7 km north), Bere Ferrers (4.1 km south), Saltash (8.7 km south) and St Budeaux Victoria Road (9.3 km south). 6 stations lie within 10 km in all. Of the five, Gunnislake is the most punctual at 85.8% and Saltash the least at 70.5%, with Bere Alston on 82.5%.
Bere Alston takes its name from a Village called Bere Alston, and the station stands 0.3 km from its centre.
Bere Alston has slipped a little, from 87.2% within three minutes in the previous 13 periods to 82.5% in the latest 13, a fall of 4.7 percentage points. Cancellations fell to 2.3% of scheduled stops from 3.0%, which is 0.7 percentage points fewer.
Compared with 3 stations of a similar size in South West, Bere Alston is the least punctual, at 82.5%. All of them are ahead, including St Budeaux Victoria Road (83.5%), Calstock (85.5%) and Gunnislake (85.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,134 | 82.5% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Bere Alston? Delay Repay
These operators call at Bere Alston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 85.6% | 0.4% |
| Period 6 of 2026-27 | 472 | 81.3% | 2.8% |
| Period 5 of 2026-27 | 474 | 76.6% | 6.1% |
| Period 4 of 2026-27 | 472 | 79.4% | 4.7% |
| Period 3 of 2026-27 | 472 | 80.8% | 3.4% |
| Period 2 of 2026-27 | 468 | 82.6% | 3.0% |
| Period 1 of 2026-27 | 534 | 84.9% | 0.6% |
| Period 13 of 2025-26 | 510 | 90.8% | 0.8% |
| Period 12 of 2025-26 | 464 | 89.6% | 0.4% |
| Period 11 of 2025-26 | 464 | 86.0% | 2.6% |
| Period 10 of 2025-26 | 412 | 77.5% | 2.4% |
| Period 9 of 2025-26 | 464 | 77.8% | 2.2% |
| Period 8 of 2025-26 | 464 | 78.5% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| St Budeaux Victoria Road | 6,134 | 83.5% | 2.1% |
| Calstock | 6,102 | 85.5% | 2.7% |
| Gunnislake | 6,102 | 85.8% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out