Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Guildford

All trains at GuildfordCrossCountry across BritainSouth East

On time, last 13 periods–Whole station: 82.1%
Cancelled–Whole station: 3.0%
Scheduled stops98Of 132,092 at the station

How this operator is doing here

There are not enough usable records of CrossCountry at Guildford to report how punctual it is.

Period by period

50%60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 56.6%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 13.9%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

Other operators at Guildford

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway106,46683.5%2.4%
Great Western Railway25,52876.1%5.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out