Southeastern at Greenhithe for Bluewater
All trains at Greenhithe for BluewaterSoutheastern across BritainSouth East
How this operator is doing here
Southeastern had 47,956 scheduled stops at Greenhithe for Bluewater in the 13 periods to Period 7 of 2026-27, 65% of the station's total. 82.0% of recorded arrivals came within three minutes and 3.0% of stops were cancelled.
Southeastern trains at Greenhithe for Bluewater also serve Stone Crossing (1.1 km west, 86.6% on time, 1.8% cancelled), Swanscombe (2.2 km east, 86.1% on time, 1.8% cancelled), Ebbsfleet International (3.0 km east, 81.2% on time, 1.7% cancelled), Northfleet (3.1 km east, 86.5% on time, 1.9% cancelled), Dartford (4.2 km west, 83.2% on time, 1.3% cancelled) and Gravesend (6.1 km east, 81.4% on time, 3.0% cancelled), which are the stations on its network closest to Greenhithe for Bluewater.
Within 30 km of here, Southeastern runs best at Sundridge Park, 18.4 km west (99.4%), and worst at Newington, 28.9 km east (69.0%).
The busiest Southeastern station within 30 km of Greenhithe for Bluewater is London Bridge, 26.0 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Greenhithe for Bluewater, Southeastern is the least punctual, at 82.0%.
Southeastern at Greenhithe for Bluewater has not moved in one direction over three full railway years: 87.3% within three minutes in 2023-24, 81.6% in 2024-25 and 83.0% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,770 | 81.3% | 2.0% |
| Period 6 of 2026-27 | 3,726 | 80.1% | 2.5% |
| Period 5 of 2026-27 | 3,869 | 81.8% | 4.3% |
| Period 4 of 2026-27 | 3,789 | 85.7% | 2.2% |
| Period 3 of 2026-27 | 3,855 | 79.2% | 3.7% |
| Period 2 of 2026-27 | 3,739 | 80.5% | 7.5% |
| Period 1 of 2026-27 | 4,370 | 86.7% | 2.8% |
| Period 13 of 2025-26 | 3,936 | 83.5% | 2.3% |
| Period 12 of 2025-26 | 2,477 | 81.8% | 1.9% |
| Period 11 of 2025-26 | 3,716 | 82.0% | 2.6% |
| Period 10 of 2025-26 | 3,131 | 85.9% | 2.3% |
| Period 9 of 2025-26 | 3,737 | 78.1% | 2.3% |
| Period 8 of 2025-26 | 3,841 | 79.1% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Greenhithe for Bluewater
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,652 | 83.4% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out